Tender Details
001388_HV Blue-Red Feeder
Business Name
James Cook University
VP Reference #
VP523043
Buyers Reference #
001388
Opens
Thursday 27 August 2026
(E. Australia Standard Time)
Closes
Monday 05 October 2026 05:00 PM
(E. Australia Standard Time)
CLOSED
Supplier query cut-off
Sunday 27 September 2026 05:00 PM
(E. Australia Standard Time)
Expected decision
Monday 02 November 2026
(E. Australia Standard Time)
Buyer Details
Business Name
James Cook University
Location
James Cook Dr
Douglas, Queensland 4814
Australia
WebSite:
https://www.jcu.edu.au/
Business Info
James Cook University
Contact Details
The buyer has elected to have their personal and contact details hidden. These details will be revealed at the buyers discretion.
What the buyer is requesting
Details
James Cook University (JCU) is seeking suitably qualified contractors to deliver high voltage (HV) infrastructure
upgrades at the Townsville campus as part of a broader program to improve network reliability, safety and
future capacity.
The works comprise the supply, installation, testing and commissioning of HV electrical infrastructure, including
associated civil works and modifying and reconfiguring portions of the existing 11kV reticulation network.
Background information / Compatibility requirements
Details
The scope includes two primary components:
• Townsville HV Modification – Blue and Red Feeder: Intent is to underground portions of the blue
feeder and red feeder along Jospeh Banks Drive and James Cook Drive. This includes, but is not limited to
installation of new HV cabling, conduits, pits, reconfiguration of feeder arrangements, installation of new
GMSs, RMUs and substations, reconnection of existing assets, extension of the site-wide global earthing
system, and removal of redundant overhead lines and poles along key campus routes. Integration is
required with contractor delivering footpath and earthworks on Jospeh banks drive to ensure minimum
design cover achieved.
• Townsville HV Modification – GMS Install: Delivery, installation and integration of Gas-insulated ring
main unit switching infrastructure at the front of campus as part of HV fault level mitigation works. The
intent is to cater for the increased prospective HV fault levels and provide switching capabilities for
reconfiguring the network. This includes, but is not limited to GMSs Installation with associated earth grid
provisions.
Supplier lists selected
Lists
Building Trade, Repairs, Maint.
ELEC, Lighting, Equip & Services
Electronic Components & Supplies
IT & Telecomms
Utilities
Categories selected
Categories
Building Trade & Repairs & Maintenance Services
1: Data Cabling Services
2: Electrical & Lighting Maintenance Supplies & Servi
Electrical Systems, Lighting, Equipment & Services
1: Electrical Services
Electronic Components & Supplies
1: Electronic Components & Supplies
IT & Telecomms
1: Services - Data Cabling Services
2: Services - Maintenance Agreements
3: Services - Other
Utilities
1: Electricity
Regions of Service
Locations
Queensland
1: Northern
All Regions of Service locations are within Australia.
Information requested by others
31/Aug/2026 08:32 AM
Question
:
Good Morning
May we please register Bernie Travers and Kris Williams for the Tender briefing on Thursday 3rd September at 9am.
Thank you,
Answered on 31/Aug/2026 11:39 AM
:
Good morning,
Thank you for letting us know.
Thanks,
Hayley.
31/Aug/2026 11:54 AM
Question
:
Milspec Energy Solutions would like to formally notify that we would like to attend the site brief and tender walk through on the 3rd of September 2026.
Ben Campbell
Director
Answered on 31/Aug/2026 11:58 AM
:
Good morning,
Thank you for letting us know.
Thanks,
Hayley.
02/Sep/2026 10:45 AM
Question
:
Hi,
Will high vis / long sleeve clothing with steel cap boots (possibly helmet & safety glasses etc) be required for the tender walk through on the 3rd Sept? OR will general office wear and enclosed shoes be satisfactory?
Answered on 02/Sep/2026 11:39 AM
:
Good morning,
Hi-viz or steel caps are not required for the site visit.
Thank you,
Hayley
03/Sep/2026 02:46 PM
Question
:
Good afternoon
in the scope of work documents - section 14- Timeline it states the below:
14. Timeline A detailed program is to be submitted with tenders to demonstrate the contractor’s ability to complete the works on time
• Refer indicative timetable under Schedule 1 and required milestones.
Can you please confirm where the schedule 1 is located.
thank you
Answered on 07/Sep/2026 10:39 AM
:
Good morning,
Schedule 1 is the "Request for Tender" Document in the document suite attached to this tender request.
Thank you,
Hayley.
08/Sep/2026 01:32 PM
Question
:
Please confirm whether existing LV distribution drawings and maximum demand data for the affected substations and switchboards will be issued as an addendum.
Enfra require this information to determine the extent of LV loads requiring temporary supply and to accurately size and price temporary generation during the proposed outage and changeover works
Answered on 10/Sep/2026 09:05 AM
:
Contractor is to refer to single line diagrams for substation sizes i.e. Drawing E400 from ‘001388_Attachment 2_STP25-1431 Electrical_Blue Feeder HV Upgrade_IFT Drawings_Rev A_25.08.2026’.
Contractor is to allow to cover existing substation downtimes accordingly based on their own staging plans. Further specific information can be provided to the successful tenderer once they have been engaged and have finalised their outage and staging plans which may or may not require the use of temporary generators, depending on network configurations and proposed downtimes.
17/Sep/2026 12:45 PM
Question
:
Commercial offers have been received for the specified ABB SafePlus switchgear, with current supplier lead times advised at approximately 28 weeks from approved drawings.
It is understood that the intended project programme may require the works to be completed earlier than the current lead time would allow.
Can JCU please confirm whether the advised 28-week lead time is acceptable for the project?
Alternatively, would JCU consider alternative switchgear options where equivalent technical requirements can be achieved with improved lead times, subject to JCU review and approval?
Answered on 17/Sep/2026 01:05 PM
:
Good afternoon,
Please be advised that JCU requires the ABB switchgear to be quoted. Please advise the required lead time in your program.
No alternatives will be accepted for the switchgear.
Thank you,
Hayley.
17/Sep/2026 12:51 PM
Question
:
We request that JCU consider a one-week extension to the current tender closing date.
Given the nature of the project, the proposed methodology and sequencing of the works will be critical to developing a practical and achievable delivery approach. The additional time would allow for these requirements to be more thoroughly considered and for a more detailed and well-developed tender response to be provided.
Additional time would also allow key subcontractors and suppliers to properly review and refine their offers and pricing, particularly given the specialist nature of several components of the works.
Answered on 17/Sep/2026 12:59 PM
:
Good afternoon,
Please be advised that JCU can extend the closing date for submissions until Monday 5th October 2026. This will be amended on VendorPanel accordingly.
Thanks,
Hayley.
22/Sep/2026 12:32 PM
Question
:
Hi,
Following up on previpous request for site Loads of the campus in the affected areas
Answered on 02/Oct/2026 01:52 PM
:
Dear Tenderer
Q2 – Site loads for the campus in the affected areas
Response:
Site load information for individual locations will not be provided as part of the tender. Tenderers are to refer to the single line diagram for the relevant ratings and plan accordingly for outages required during cutovers in accordance with the tender documentation. The successful contractor may request further specific load information, if required, following award.
22/Sep/2026 12:39 PM
Question
:
Afternoon Hayley,
Regarding the proposed civil works along Joeph banks avenue, can you advise the following
* expected time frame?
* the existing bank near US48 will be removed during this process can you advise if the existing comms piuts/ conduits and cables in this area will be part of the civiol works package by others?" as well as Poe U11 is in this area and needs to remaion until tyhe HV cutovers how id this pole being temporary supported with the surrouinding area being dropped by 1.5m? As part of this tender do we need to allolwe for a tempooary support structure as in order to trench we need to below the expected level?
Answered on 02/Oct/2026 01:51 PM
:
Dear Tenderer
Q1 – Proposed civil works along Joseph Banks Avenue
Response:
The civil works form part of the Principal Contractor's scope and were issued as part of Addendum 1. Tenderers are to make appropriate allowance for the civil works required to undertake their scope, having regard to the information provided in Addendum 1. Tenderers are to provide their proposed program as part of their tender submission.
Updates made to this Request
31/Aug/2026 03:47 PM
Please note: The following addenda have been recently added.
1. Added: (Addendum) Addendum 1_Attachment 5_Fortisem_T02A-26302 _Civil footpath Joseph Banks_IFC Drawings_revB_27.08.2026.pdf
2. Added: (Addendum) Addendum 1_Attachment 6_Fortisem_T02A-26302 _Civil footpath Joseph Banks_transmittal_revB_dated 27.08.2026.pdf
Please consider these addenda when responding.
09/Sep/2026 10:15 AM
Please note: The following addenda have been recently added.
1. Added: (Addendum) Addendum 2.1_SP200970_JCU easement AA.pdf
2. Added: (Addendum) Addendum 2.2_TSS23010-007 - SW As-Constructed Survey_Tropical Solutions_20.07.2023.pdf
3. Added: (Addendum) Addendum 2.3_Proposed_FINAL JBA Extension Works_STP_02.03.2023.pdf
4. Added: (Addendum) Addendum 2.4_Proposed_Stage 1 JBA Intersection Layouts_STP_02.03.2023.pdf
5. Added: (Addendum) Addendum 2.5_STP22-0962_E1100 [3]_construction issue for reference.pdf
6. Added: (Addendum) Addendum 2.6_STP22-0962_E1101 [2]_construction issue for reference.pdf
7. Added: (Addendum) 001388_Addendum 2.pdf
Please consider these addenda when responding.
11/Sep/2026 03:17 PM
Please note: The following addenda have been recently added.
1. Added: (Addendum) 001388_Addendum 3.pdf
2. Added: (Addendum) Addendum 3.1_Photos of existing electrical infrastructure for contract interface_Rev2.pdf
Please consider these addenda when responding.
17/Sep/2026 01:00 PM
Revised closing date for Tenders: Monday 5th October 2026 at 5pm AEST.
18/Sep/2026 01:00 PM
Please note: The following addenda have been recently added.
1. Added: (Addendum) 001388_Addendum 4.pdf
2. Added: (Addendum) Addendum 4.1_12675445 JCU Substations Earth Grid Design_Combined drawing set_GHD_IFT_RevA_dated 17.09.2026.pdf
3. Added: (Addendum) Addendum 4.2_12675445-REP_JCU Substations US48 & U14 Earthing Report & Spec_GHD_revA_dated 17.09.2026.pdf
Please consider these addenda when responding.