Tender Details
Project Delivery Team - ETCS L2 on Sector 1 South
Business Name
Department of Transport and Main Roads - PRS
VP Reference #
VP455436
Buyers Reference #
CN-24540
Opens
Thursday 03 April 2025 (E. Australia Standard Time)
Closes
Wednesday 07 May 2025 02:00 PM (E. Australia Standard Time) CLOSED
Supplier query cut-off
Thursday 24 April 2025 02:00 PM (E. Australia Standard Time)
Expected decision
Monday 28 July 2025 (E. Australia Standard Time)
Buyer Details
Business Name
Department of Transport and Main Roads - PRS
Location
140 Creek St
Brisbane City, Queensland 4000
Australia
WebSite:
https://www.tmr.qld.gov.au/
Business Info
The Department of Transport and Main Roads provides reliable, resilient and responsive transport networks and digital services that are safe and accessible for everyone. This procurement is led by TMR's Passenger Rollingstock and Signalling (PRS) branch.
Contact Name
Hailey Engle
Position:
Advisor (Procurement)
Primary phone:
07 5439 6944
Mobile phone:
None Provided
Fax number:
None Provided
Email:
hailey.z.engle@tmr.qld.gov.au
What the buyer is requesting
Details
As per attached Invitation to Offer
Supplier lists selected
Lists
  • Business & Administrative Services
  • Engineer, Research, Tech services
  • Management Advisory Services
  • Railway, Tramway and Track
Categories selected
Categories
  • Business & Administrative Services
    1: Business & Strategic Planning services
  • Engineering & Research & Technical Based Services
    1: Engineering Consulting Services
    2: Project Management
  • Management Advisory Services
    1: Economic Analysis
    2: Management Consulting
    3: Professional Services
    4: Risk Management
  • Railway, Tramway and Track
    1: Buildings and Structures
    2: Components and Other Systems
    3: Engineering Services
    4: Other Services
    5: Safety, Signalling and Control Systems
Regions of Service
Locations
  • Queensland
    1: Brisbane
    2: Gold Coast
    3: Sunshine Coast

All Regions of Service locations are within Australia.
Information requested by others
10/Apr/2025 02:49 PM
Question:
In Response Form 6.2 Offeror Response to Evaluation Criteria there appears to have been an administrative error. The three response dot points are the same for 3. Methodology, 4. Risk Management and 5. Terms and Conditions. These don't seem to align with the evaluation criteria for Risk Management and Terms and Conditions. Can you please confirm if this is correct? Thank you.

Answered on 11/Apr/2025 10:01 AM:


Criteria 3 - Methodology

• Presents a logical approach to effectively overseeing the delivery of ETCS L2 on sector 1 south

• Outlines both a strategic and practical approach towards managing interfaces between projects.

• Outlines both a strategic and practical approach towards stakeholder engagement.

Criteria 4 – Risk Management

• Implements and maintains detailed risk management strategies.

• Insurance coverage and liability provisions.

• Provides suitable business continuity plans in case of disruptions.

Criteria 5 – Terms and Conditions

• Clarity and acceptability of the proposed contract terms and conditions.

• Flexibility and negotiation potential in contract terms.
Updates made to this Request
07/Apr/2025 02:36 PM
Please note: The following addendum has been recently added.

1. Added: (Addendum) CN-24540 Clarification or Addendum 01.pdf

Please consider this addendum when responding.

15/Apr/2025 10:38 AM
Please note: The following addendum has been recently added.

1. Added: (Addendum) CN-24540 Clarification or Addendum 02.pdf

Please consider this addendum when responding.

15/Apr/2025 12:17 PM
Please note: The following addendum has been recently added.

1. Added: (Addendum) CN-24540 Clarification or Addendum 03.pdf

Please consider this addendum when responding.

16/Apr/2025 09:34 AM
Please note: The following addendum has been recently added.

1. Added: (Addendum) CN-24540 Clarification or Addendum 04.pdf

Please consider this addendum when responding.

23/Apr/2025 03:11 PM
Please note: The following addendum has been recently added.

1. Added: (Addendum) CN-24540 Clarification or Addendum 05.pdf

Please consider this addendum when responding.