Quambatook Road Widening and Rehabilitation – Stage 3
Business Name
Swan Hill Rural City Council
VP Reference #
VP506150
Buyers Reference #
Contract 26 49 1905
Opens
Wednesday 15 April 2026
(AUS Eastern Standard Time)
Closes
Tuesday 12 May 2026 02:00 PM
(AUS Eastern Standard Time)
CLOSED
Supplier query cut-off
Wednesday 06 May 2026 02:00 PM
(AUS Eastern Standard Time)
Expected decision
Tuesday 09 June 2026
(AUS Eastern Standard Time)
Buyer Details
Business Name
Swan Hill Rural City Council
Location
4369 Campbell St
Swan Hill, Victoria 3585
Australia
WebSite:
http://www.swanhill.vic.gov.au/
Business Info
Swan Hill Rural City Council
Contact Details
The buyer has elected to have their personal and contact details hidden. These details will be revealed at the buyers discretion.
What the buyer is requesting
Details
Swan Hill Rural City Council seeks a qualified and experienced contractor to carry out road widening and rehabilitation works along the identified section of Quambatook Road in Kunat, VIC 3585.
Background information / Compatibility requirements
Details
The project aims to improve a total length of 2,400 metres of road infrastructure along Quambatook Road. The upgrade covers from Mystic Park – Meatian Road – Quambatook Road intersection (Ch 16.96 Pozi or Ch 0 Plan) to 790 meters south of Holmes Road (Ch 14.56 Pozi or Ch 2400 Plan).
The section of Quambatook Road designated for this project is a collector road that is affected by pavement failures and does not provide sufficient width for two traffic lanes.
Council now requires the services of a contractor to reconstruct the road.
Supplier lists selected
Lists
Building Products & Materials
Construction & Operation
Categories selected
Categories
Building Products & Materials
1: Asphalt & Bitumen
Construction & Operation
1: Building Construction Materials & Services
2: Other Civil Construction Materials & Services
3: Road Building Products & Maintenance & Services
4: Road Line Marking
Regions of Service
Locations
Victoria
1: Mallee
All Regions of Service locations are within Australia.
Information requested by others
17/Apr/2026 03:07 PM
Question
:
Could Council please comment on whether the road can be fully blocked off for the duration of construction, or alternatively, any access requirements that must be provided to the general public or adjoining landowners? Any information available on frequency and location of the expected access would be appreciated, including whether one lane of traffic needs to remain available at all times?
Answered on 17/Apr/2026 04:43 PM
:
Per Special Conditions of Contract, full road closure shall not be permitted during the construction period. Commuters must be advised of the upcoming road works through Variable Message Signs (VMS) installed at least one week prior to commencement. Full closure is discouraged on the basis that the subject road is designated as both a Higher Mass Limit (HML) Route and a B-double Heavy Vehicle Route. As such, local access is to be maintained at all times, with traffic managed under a one-lane arrangement for the duration of the works at certain stage as per Contractor's staging plan or methodology.
28/Apr/2026 05:08 PM
Question
:
Could Council please provide the following information in relation to the existing roadside vegetation:
1) Are Council expecting the tenderer to price the trimming and/or removal of roadside vegetation and if so 2) Could Council provide any documentation (Arborist Report or similar) to guide us as to the extents and general nature of the trimming involved?
Alternatively, could Council confirm that the tree trimming and clearing works will be handled prior to the successful contractor being awarded possession of site?
Thank you.
Answered on 30/Apr/2026 03:46 PM
:
1. No. Tree removal and trimming are not required to be priced and included in the tender submissions.
2. Tree removal and trimming, including the Arborist Report, will be undertaken by Council. These works are anticipated to be completed prior to the commencement of construction works.
Updates made to this Request
Updates
None...