26_155 Warwick Art Gallery Solar System Installation
Business Name
Southern Downs Regional Council
VP Reference #
VP502805
Buyers Reference #
26_155
Opens
Wednesday 18 March 2026 (E. Australia Standard Time)
Closes
Tuesday 07 April 2026 02:00 PM (E. Australia Standard Time) CLOSED
Supplier query cut-off
Tuesday 07 April 2026 02:00 PM (E. Australia Standard Time)
Expected decision
Tuesday 21 April 2026 (E. Australia Standard Time)
Buyer Details
Business Name
Southern Downs Regional Council
Location
64 Fitzroy St
Warwick, Queensland 4370
Australia
WebSite:
http://www.southerndowns.qld.gov.au/
Business Info
The Southern Downs Regional Council was formed on the 15th of March 2008 as an outcome of the Queensland Local Government Reform process. This new governing body encompasses the areas previously occupied by the Warwick and Stanthorpe Shire Councils.
Contact Details
The buyer has elected to have their personal and contact details hidden. These details will be revealed at the buyers discretion.
What the buyer is requesting
Details
Southern Downs Regional Council invites tenders from suitably qualified respondents for design and installation of grid connected, 90 kw capacity of rooftop solar photovoltaic system including roof suitability confirmation and minor defects repairs at Art Gallery, Warwick Queensland.
Background information / Compatibility requirements
Details
Southern Downs Regional Council is looking to explore renewable energy options (Solar Power in this case) in light of Southern Downs’ Environmental Sustainability Strategy 2021- 2031 (can be downloaded from https://www.sdrc.qld.gov.au/), which sets out the Council’s commitment to sustainability and Southern Downs’ natural environment.

In 2021, Southern Downs Regional Council engaged Peak Services to undertake energy audits and a solar power concept design study of selected sites.

The mixed-use building complex comprises Stanthorpe Library, and Stanthorpe Regional Art Gallery was one of the recommended sites for installation of a rooftop solar system.
Desired Outcomes ('Nice to haves', Conditions & Warranties, SLA's, Project benefits)
Details
To reduce reliance on grid supply, lower energy cost and contribute towards sustainability objectives of the Council, design and construct a grid-connected rooftop solar system with a capacity of up to 90Kw through three phases/stages to ensure roof is suitable and ready for solar installation:

• Structural assessment to confirm roof suitability.

• Roof preparation through protective paint/ coating and repair

• Installation, commissioning and handover of solar PV systems.
Supplier lists selected
Lists
  • Building Trade, Repairs, Maint.
  • Construction & Operation
  • ELEC, Lighting, Equip & Services
Categories selected
Categories
  • Building Trade & Repairs & Maintenance Services
    1: Building Maintenance & Services
    2: Electrical & Lighting Maintenance Supplies & Servi
    3: Roofing Services
  • Construction & Operation
    1: Building Construction Materials & Services
  • Electrical Systems, Lighting, Equipment & Services
    1: Electrical Services
Regions of Service
Locations
  • Queensland
    1: Darling Downs

All Regions of Service locations are within Australia.
Information requested by others
26/Mar/2026 03:18 PM
Question:
1. Could you explain why optimisers are required for this system?



2. The title states that no battery is included. However, there is also a requirement that contractors provide a quote including a compatible battery. Could you clarify the expected battery scope, including the approximate size, if one is needed?

Answered on 27/Mar/2026 01:20 PM:


1. Optimisers are preferred as they will allow Council to identify faults, degradation or monitor underperforming panels without accessing the roof, subsequently reducing investigation time and improving efficiency.

2. Contractors may submit a separate optional quote for the battery only if they believe that battery will provide operational or financial benefit. If the contractor is providing the optional battery quote, the contractor may recommend size and configuration based on their professional judgement, site and compatibility factors.
26/Mar/2026 03:25 PM
Question:
26/03/2026

Questions from the site inspection

- Is there a chance that the tender could be broken into the 3 separate tenders?

Contractor is to basically engage an Structural Engineer and also an Electrical Engineer to be able to process the job. If found that the structure is sound for the installation, then the contractor under phase 2 is required then to engage a contractor to make and repairs to the roof. The cost of which almost unknow until a contractor can inspect and provide a cost for the repairs / replacement of the roof.

- What Level of reports and or Approvals is SDRC looking to receive back from the initial inspections? ie. Form 15?

- Is there a dedicated site laydown area for the Project? (Can a section of carpark be taken up?)

- Could an Asbestos register be provided to be able to give an better estimation?

- Will the Art Gallery be closed during the installation of the Solar system?

- Do you have intended location for the Inverters and isolation points?

Answered on 27/Mar/2026 01:25 PM:


- No. The reason for the structure of this request is to improve the efficiency of this proposal. The additional time requirements for SDRC to split this into multiple RFQ processes extends the time for delivery and increases the investment considerably.

- For the same reasons that the RFQ is not split into three portions, SDRC are looking to confirm the suitability of the installation and surface preparation is completed before the main portion of the job (ie the solar panel installation).

- SDRC expect the installation to be certified to the appropriate levels.

- Council may allow small section of carpark for temporary laydown only if there is minimal disruption to vehicular, pedestrian movement and safe access is provided to staff and community.

- Yes, will be provided as an addendum in due course.

- No. however, short (few hours) and controlled shutdowns are permitted if scheduled in advance.

- Council has not predetermined the location. As contractors propose suitable location in design, they must consider compliance and regulatory requirement, safe access for maintenance, ventilation proximity of switchboard and cable pathways and safety requirement, aesthetics of art gallery. Council will review and approve the proposed location.
Updates made to this Request
27/Mar/2026 01:44 PM
Please note: The following addendum has been recently added.

1. Added: (Addendum) 26_155 - Addendum 1.pdf

Please consider this addendum when responding.