Tender Details
Buronga Landfill Stage 1, Cells 2 & 3 Design
Business Name
Wentworth Shire Council
VP Reference #
VP525795
Buyers Reference #
PT2627/01
Opens
Wednesday 16 September 2026
(AUS Eastern Standard Time)
Closes
Thursday 08 October 2026 12:00 PM
(AUS Eastern Standard Time)
CLOSED
Supplier query cut-off
Friday 02 October 2026 11:00 AM
(AUS Eastern Standard Time)
Expected decision
Thursday 29 October 2026
(AUS Eastern Standard Time)
Buyer Details
Business Name
Wentworth Shire Council
Location
61 Darling St
Wentworth, New South Wales 2648
Australia
WebSite:
https://www.wentworth.nsw.gov.au/
Business Info
None provided
Contact Details
The buyer has elected to have their personal and contact details hidden. These details will be revealed at the buyers discretion.
What the buyer is requesting
Details
Wentworth Shire Council is seeking tenders from suitably qualified & experienced consultants to undertake design works for the Buronga Landfill facility.
Supplier lists selected
Lists
Engineer, Research, Tech services
Categories selected
Categories
Engineering & Research & Technical Based Services
1: Engineering Consulting Services
Regions of Service
Locations
New South Wales
1: Far West
All Regions of Service locations are within Australia.
Information requested by others
24/Sep/2026 10:47 AM
Question
:
Daer sir/madam
Appendix A provides details of the Cell 1 design. Does Council have a plan of the proposed Cell 2 and 3 footprint?
Answered on 29/Sep/2026 02:33 PM
:
As contained within the Appendix B - Geotechnical Investigation Report Final, a concept design of the floor of Stage 1 has been prepared (Figure 1.1 Landfill Stage 1A). Whilst Cells 2 and 3 aren’t specifically identified, it is believed sufficient information is contained in this drawing to guide detailed design requirements.
25/Sep/2026 12:07 PM
Question
:
Good afternoon,
On review of the request, there appears to be multiple contracts referenced as well as special conditions referenced which may or may not related to one of the three contracts or all three contracts (and no order of precedence):
1. General Conditions (cl 21) which has 16 clauses;
2. A Purchase Order that is referenced (which may or may not have terms);
3. Contract which is capitalised though not defined but references the AS4122 (which may or may not have amendments); and
4. Special Conditions.
Can Council please confirm which contract conditions are specifically relevant to this project?
Regards,
Chris
Answered on 29/Sep/2026 01:55 PM
:
The Scope of Works is to be undertaken under an agreement formed under AS4122. Any conditions of contract will be incorporated into this Agreement.
01/Oct/2026 10:43 AM
Question
:
Hi Procurment,
We have reviewed the tender documentation and would appreciate clarification on the following items to ensure we correctly understand the required scope and can provide an appropriately scoped lump-sum fee.
1. Extent of Cell 3 Design
Please confirm the extent of Stage 1A Cell 3 required under this project.
Is Council expecting the consultant to determine the extent of Cell 3 necessary to facilitate the safe construction and operation of Cell 2, or is there a defined footprint that Council expects to be designed?
2. Leachate and Stormwater Ponds
• Please confirm whether the proposed leachate pond and stormwater pond shown on Drawing 17 (page 24 of 28) form part of the project scope.
• If not, please confirm whether the existing leachate and stormwater systems are intended to service Cells 2 and 3.
• Please also confirm whether the consultant is expected to assess the capacity and suitability of the existing systems to accommodate the proposed development.
3. Existing Leachate Management System Information
Could Council please provide any available information regarding the existing leachate management system, including:
• As-constructed drawings.
• Schematics and layout plans.
• Existing pipework and pump details.
• Leachate pond details and capacity.
• Any other information relevant to understanding the existing system configuration and operation.
4. Survey Information
Please confirm what survey information is available for the site, including:
• The latest site survey.
• Any as-constructed survey of Stage 1A Cell 1.
• Survey information for the existing landfill, leachate and stormwater infrastructure.
• Whether native survey/model files, such as DWG, DXF, LandXML or 12d files, will be made available to the successful consultant.
5. Stage 1A Cell 1 Information
Please confirm whether Council can provide:
• As-constructed drawings.
• Construction quality records, including inspection/testing records and liner installation records, where available.
• As-constructed survey data.
• Any other records relevant to the interface between Cell 1 and the proposed Cells 2 and 3.
6. Approvals and EPA Involvement
Please confirm the consultant's expected role in obtaining approvals, including whether the consultant is expected to:
• Prepare supporting documentation.
• Liaise directly with regulators.
• Submit documentation on Council's behalf.
• Respond to regulator comments through to approval.
Alternatively, will Council manage the approval process with consultant support as required?
7. Review and Comment Cycles
For pricing purposes, please confirm whether Council has an expected number of design review/comment cycles that should be allowed for, including Council and regulatory stakeholder reviews.
8. Design Verification
The tender methodology refers to responding to Design Verification Queries: Please confirm whether the design verification will be undertaken by a party appointed by Council, and whether the consultant's scope is limited to responding to verification comments.
9. Additional Site Investigations
Please confirm whether Council anticipates any additional geotechnical, groundwater, survey, testing, or landfill interface investigations beyond the information provided in the tender package: If so, please confirm whether these should be included in the tender fee.
10. Stormwater Scope
Please confirm whether the stormwater design scope is limited to Cells 2 and 3 and their connection to the existing site stormwater system, or whether review and/or upgrade of the broader site stormwater system is expected.
11. Leachate Scope
Please confirm whether the leachate scope is limited to collection, conveyance, pumping, and connection of Cells 2 and 3 into the existing system, or whether broader upgrades to the existing leachate management system are expected.
12. Construction Staging
Please confirm whether a formal construction staging/operational sequencing plan is required as a deliverable, or whether staging is only required to be addressed as part of the design methodology.
13. Design Submission Stages
Please confirm the required formal design submission/review stages and whether a separate Issued for Construction (IFC) issue is required following Council review.
14. Construction Phase Services
Please confirm whether construction-phase design support, including RFIs, site attendance and design changes, is included in this commission or would be separately engaged if required.
15. Construction Quality Assurance (CQA)
Please confirm whether the scope is limited to preparation of the CQA Plan, or whether construction-phase CQA services, inspections, testing oversight, certification and/or a final CQA report are also required.
16. Additional Requirements
Are there any Council-specific requirements, site constraints, or operational requirements applicable to this project that are not included in the tender documents and should be allowed for in the consultant's scope?
Poen (Jan-Hendrik) Boshoff
Senior Engineer - Civil
T: 61498372154
WSP
Level 2, 121 Marcus Clarke Street
Canberra, 2601
Australia
Answered on 02/Oct/2026 12:54 PM
:
Good afternoon,
Please find responses listed under each question below.
1. Extent of Cell 3 Design
Please confirm the extent of Stage 1A Cell 3 required under this project.
Is Council expecting the consultant to determine the extent of Cell 3 necessary to facilitate the safe construction and operation of Cell 2, or is there a defined footprint that Council expects to be designed?
RESPONSE: The extent of works for the design of Stage 1A Cell 3 is only that required to enable the safe construction and operation of Stage 1A Cell 2. Respondents will be required to define this footprint as part of their work.
2. Leachate and Stormwater Ponds
• Please confirm whether the proposed leachate pond and stormwater pond shown on Drawing 17 (page 24 of 28) form part of the project scope.
RESPONSE: No – the leachate pond and stormwater pond do not form part of the project scope.
• If not, please confirm whether the existing leachate and stormwater systems are intended to service Cells 2 and 3.
RESPONSE: The existing leachate and stormwater systems are intended to Service Cells 2 and 3.
• Please also confirm whether the consultant is expected to assess the capacity and suitability of the existing systems to accommodate the proposed development.
RESPONSE: The consultant is not expected to assess the capacity and suitability of the existing systems to accommodate the proposed development
3. Existing Leachate Management System Information
Could Council please provide any available information regarding the existing leachate management system, including:
• As-constructed drawings.
• Schematics and layout plans.
• Existing pipework and pump details.
• Leachate pond details and capacity.
• Any other information relevant to understanding the existing system configuration and operation.
RESPONSE: Council will follow up and respond separately to this item.
4. Survey Information
Please confirm what survey information is available for the site, including:
• The latest site survey.
• Any as-constructed survey of Stage 1A Cell 1.
• Survey information for the existing landfill, leachate and stormwater infrastructure.
• Whether native survey/model files, such as DWG, DXF, LandXML or 12d files, will be made available to the successful consultant.
RESPONSE: Appendix D information is available in a suitable survey model to the successful consultant, as will relevant as-constructed survey information for Stage 1A Cell 1.
5. Stage 1A Cell 1 Information
Please confirm whether Council can provide:
• As-constructed drawings.
• Construction quality records, including inspection/testing records and liner installation records, where available.
• As-constructed survey data.
• Any other records relevant to the interface between Cell 1 and the proposed Cells 2 and 3.
RESPONSE: An EPA approved As Constructed report will be made available to the successful respondent. It is anticipated that all of this information is contained within this report.
6. Approvals and EPA Involvement
Please confirm the consultant's expected role in obtaining approvals, including whether the consultant is expected to:
• Prepare supporting documentation.
• Liaise directly with regulators.
• Submit documentation on Council's behalf.
• Respond to regulator comments through to approval.
Alternatively, will Council manage the approval process with consultant support as required?
RESPONSE: Council will manage the approval process with consultant support as required. In so saying, it is expected that the consultant will make suitable allowance for reporting and engagement with the Regulator to ensure the provided information meets the expectations of the Regulator.
7. Review and Comment Cycles
For pricing purposes, please confirm whether Council has an expected number of design review/comment cycles that should be allowed for, including Council and regulatory stakeholder reviews.
RESPONSE: Yes – Council would expect the successful Respondent to make an allowance for review and comment on their designs.
8. Design Verification
The tender methodology refers to responding to Design Verification Queries: Please confirm whether the design verification will be undertaken by a party appointed by Council, and whether the consultant's scope is limited to responding to verification comments.
RESPONSE: This proposed methodology may be varied. Should design verification work be undertaken, the Consultant must ensure sufficient justification information is available to address such queries.
9. Additional Site Investigations
Please confirm whether Council anticipates any additional geotechnical, groundwater, survey, testing, or landfill interface investigations beyond the information provided in the tender package: If so, please confirm whether these should be included in the tender fee.
RESPONSE: At this time, it is not anticipated that additional investigations will be undertaken however it is up to the consultant to advise if the provided information is insufficient and if so, what additional investigatory works are required.
10. Stormwater Scope
Please confirm whether the stormwater design scope is limited to Cells 2 and 3 and their connection to the existing site stormwater system, or whether review and/or upgrade of the broader site stormwater system is expected.
RESPONSE: Stormwater controls only around Cells 2 and 3 and their connection to existing stormwater systems is required.
11. Leachate Scope
Please confirm whether the leachate scope is limited to collection, conveyance, pumping, and connection of Cells 2 and 3 into the existing system, or whether broader upgrades to the existing leachate management system are expected.
RESPONSE: Leachate controls only around collection, conveyance, pumping, and connection of Cells 2 and 3 into the existing system is required.
12. Construction Staging
Please confirm whether a formal construction staging/operational sequencing plan is required as a deliverable, or whether staging is only required to be addressed as part of the design methodology.
RESPONSE: Staging is only required to be addressed as part of the design methodology
13. Design Submission Stages
Please confirm the required formal design submission/review stages and whether a separate Issued for Construction (IFC) issue is required following Council review.
RESPONSE: It is expected that the documentation will be able to be issued up to the Issued For Tender stage.
14. Construction Phase Services
Please confirm whether construction-phase design support, including RFIs, site attendance and design changes, is included in this commission or would be separately engaged if required.
RESPONSE: Construction phase services will be sourced under a separate tender process.
15. Construction Quality Assurance (CQA)
Please confirm whether the scope is limited to preparation of the CQA Plan, or whether construction-phase CQA services, inspections, testing oversight, certification and/or a final CQA report are also required.
RESPONSE: Construction phase services will be sourced under a separate tender process. As such, this scope is limited to the preparation of the CQA Plan.
16. Additional Requirements
Are there any Council-specific requirements, site constraints, or operational requirements applicable to this project that are not included in the tender documents and should be allowed for in the consultant's scope?
RESPONSE: All relevant information has been provided as part of the existing RFT documentation.
Regards
01/Oct/2026 10:45 AM
Question
:
Hi Procurement team,
Could you please confirm the document submission requirements for the portal, including whether there are any specific requirements around:
• Insurance certificates being uploaded as separate documents.
• Separate uploads for CVs, QA documentation, and company information.
• Whether the submission is to be uploaded as a single proposal document or as multiple files.
• File naming conventions.
• File size limitations; and
• Any other portal-specific requirements we should be aware of.
Just want to make sure we package everything correctly and avoid any issues during submission.
Thanks,
Poen (Jan-Hendrik) Boshoff
Senior Engineer - Civil
T: 61498372154
WSP
Level 2, 121 Marcus Clarke Street
Canberra, 2601
Australia
Answered on 02/Oct/2026 12:27 PM
:
Good afternoon,
Appendix F of the RFT documentation incorporates a return schedule that highlights necessary information to be supplied with the RFT document covering any other requirements of the submission.
Regards
Updates made to this Request
24/Sep/2026 11:29 AM
Please note: The following attachment has been recently added.
1. Added: Tender Amendment 1.pdf
Please consider this attachment when responding.
24/Sep/2026 11:32 AM
Please note the tender closing date has been extended to 12PM Thursday 8th October 2026.