Tender Details
TMU Mudgeeraba Water Treatment Plant Package 1 - Expression of Interest
Business Name
Seqwater
VP Reference #
VP465818
Buyers Reference #
06061
Opens
Tuesday 01 July 2025 (E. Australia Standard Time)
Closes
Friday 25 July 2025 02:00 PM (E. Australia Standard Time) CLOSED
Supplier query cut-off
Friday 18 July 2025 02:00 PM (E. Australia Standard Time)
Expected decision
Tuesday 16 September 2025 (E. Australia Standard Time)
Buyer Details
Business Name
Seqwater
Location
133 Mary St
Brisbane City, Queensland 4000
Australia
WebSite:
https://www.seqwater.com.au/
Business Info
Water is essential for life.

Seqwater is the Queensland Bulk Water Supply Authority responsible for delivering safe, secure and cost-effective bulk water supply for more than three million people across South East Queensland. We also:

* provide essential flood mitigation services
* manage catchment health and offer community recreation facilities
* provide water for irrigation to about 1,200 farmers across seven water supply schemes.

Seqwater is one of the largest water businesses with the most geographically spread and diverse asset base of any capital city water authority. Our operations extend from the New South Wales border to the base of the Toowoomba ranges.
Contact Details
The buyer has elected to have their personal and contact details hidden. These details will be revealed at the buyers discretion.
What the buyer is requesting
Details
Seqwater is seeking to engage a qualified and experienced contractor to carry out design and construct (D&C) works for the Mudgeeraba (TMU) Water Treatment Plant (WTP) on the Gold Coast. The Scope of Works (SOW) includes electrical, mechanical, and construction tasks and consists of five (5) projects to be delivered as Separable Portions. All five (5) Separable Portions will have the same completion date of 13 February 2029. Each project focuses on the renewal and remediation of assets at the TMU WTP, addressing concerns such as asset condition, operability, electrical safety risks, and arc flash hazards. The work included in this package will ensure the TMU WTP continues to meet current and future water supply demands while operating safely and reliably.

The D&C services will involve conducting investigations, reviews, option analysis, assessments, calculations, reviews of specifications, and drawings (both site-specific and typical), along with the construction or installation work and necessary certifications for each asset type.

Please note that the appendices referenced in the SOW will be released as part of the RFT.
Background information / Compatibility requirements
Details
Seqwater has an ongoing obligation to refurbish existing equipment and install new equipment to meet operational needs. This includes ensuring safe equipment operation, maintaining power system capacity, and ensuring reliable performance to meet the facility’s future power supply requirements. Failure to remediate and replace the electrical assets at TMU WTP could lead to increased deterioration, decreased capacity, environmental and water quality risks.
Supplier lists selected
Lists
  • ELEC, Lighting, Equip & Services
  • Engineer, Research, Tech services
  • Instrumentation Equipment and Supplies
  • Water & Sewage
Categories selected
Categories
  • Electrical Systems, Lighting, Equipment & Services
    1: Electrical Equipment & Components & Supplies
    2: Electrical Services
    3: Switchboards & Switchgear
  • Engineering & Research & Technical Based Services
    1: Engineering Consulting Services
    2: Project Management
  • Instrumentation Equipment and Supplies
    1: Switches
    2: Transmitters
  • Water & Sewage
    1: Water & Sewage Treatment Plant Construction
Regions of Service
Locations
  • Queensland
    1: Brisbane
    2: Gold Coast
    3: Sunshine Coast

All Regions of Service locations are within Australia.
Information requested by others
Information requested
None...
Updates made to this Request
02/Jul/2025 02:03 PM
Please note: The following attachment has been recently added.

1. Added: 06061 - Expression of Interest (Part 2 of 2) V2.docx

Please consider this attachment when responding.

02/Jul/2025 02:04 PM
Please note: The following addendum has been recently added.

1. Added: (Addendum) 06061 - Addendum 1 - 2 July 2025.pdf

Please consider this addendum when responding.

03/Jul/2025 04:41 PM
Please note: The following addenda have been recently added.

1. Added: (Addendum) 06061 - Clarification 1 - 3 July 2025.pdf

2. Added: (Addendum) 06061 - Clarification 1 - WSA_201 2020 - Manual for Selection and Application of Protective Coatings.pdf

Please consider these addenda when responding.

11/Jul/2025 01:46 PM
Please note: The following addendum has been recently added.

1. Added: (Addendum) 06061 - Clarification 2 - 11 July 2025.pdf

Please consider this addendum when responding.

16/Jul/2025 03:55 PM
Please note: The following addendum has been recently added.

1. Added: (Addendum) 06061 - Addendum 02 - 16 July 2025.pdf

Please consider this addendum when responding.

16/Jul/2025 03:55 PM
Tender closing date and time has been updated to Friday 25 July 2025 as per Addendum 02.