Tender Details
Chermside New Lease Fit Out - D&C
Business Name
Children's Health QLD Hospital and Health Service
VP Reference #
VP472941
Buyers Reference #
CHQ 97 2025
Opens
Friday 08 August 2025
(E. Australia Standard Time)
Closes
Monday 22 September 2025 02:00 PM
(E. Australia Standard Time)
CLOSED
Supplier query cut-off
Friday 05 September 2025 02:00 PM
(E. Australia Standard Time)
Expected decision
Wednesday 26 November 2025
(E. Australia Standard Time)
Buyer Details
Business Name
Children's Health QLD Hospital and Health Service
Location
501 Stanley St
South Brisbane, Queensland 4101
Australia
WebSite:
https://www.childrens.health.qld.gov.au/
Business Info
A statewide network of health services and professionals delivering world-class care for Queensland kids.
Contact Details
The buyer has elected to have their personal and contact details hidden. These details will be revealed at the buyers discretion.
What the buyer is requesting
Details
Children’s Health Queensland Hospital and Health Service (CHQ) invites all Tenderers capable of executing the work, works and/or services (regional, Queensland and other) to submit a Tender in response to invitation to Tender (ITT) CHQ 097 2025 for the provision of Chermside New Lease Fit Out – Design and Construction (D&C).
The tender documents provide further details.
Questions asked by the buyer
Question 1
CHQ will hold a mandatory site visit and briefing session on Monday, 25 August 2025 10:00am. Please advise if you are able to attend the site visit and briefing session.
Supplier lists selected
Lists
Architecture, Design, Planning
Construction & Operation
Categories selected
Categories
Architecture & Urban Design & Planning Services
1: Interior Design
Construction & Operation
1: Building Construction Materials & Services
Regions of Service
Locations
Queensland
1: Brisbane
All Regions of Service locations are within Australia.
Information requested by others
11/Aug/2025 08:18 AM
Question
:
Good morning ,
Can you please confirm the closing date for this tender.
There is conflicting information between the tender form and what is on the vendor panel.
thank you
Answered on 11/Aug/2025 08:33 AM
:
Thanks for bringing this to our attention. There was a typo on the Attachment C tender form. The correct closing date is 22/09/2025, as stated in ITT Part A. We'll be issuing an addendum with a new Attachment C shortly.
11/Aug/2025 08:43 AM
Question
:
Hi,
Can you please confirm the date for the site visit, there is conflicting information.
The ITT notes the site visit on the 25th @10am where as Attachment F "request to attend site visit" notes the site visit on Friday 15th August,
Please confirm which date is correct,
Answered on 11/Aug/2025 08:49 AM
:
Thanks for bringing this to our attention. There was a typo on the Attachment F. The correct site visit date is 25/08/2025, as stated in ITT Part A. We'll be issuing an addendum with a new Attachment F shortly.
12/Aug/2025 12:01 PM
Question
:
Where is wall vinyl RF02 and RF03 located? Cannot find elevations. Could you please advise
Answered on 12/Aug/2025 02:15 PM
:
A new addendum addressing your question will be issued in due course.
20/Aug/2025 02:40 PM
Question
:
There is no comms cabinet noted on the drawings.
Can you please confirm to where it is and does it comply with Health Standards?
Answered on 21/Aug/2025 09:36 AM
:
A response to your inquiry will be provided in a new addendum.
21/Aug/2025 09:24 AM
Question
:
Can you please provide information surrounding location of comms room for these works? Is it existing? Do we need to allow for racks? Cable pathway to the rack if on another level?
Answered on 21/Aug/2025 09:37 AM
:
A response to your inquiry will be provided in a new addendum.
21/Aug/2025 03:05 PM
Question
:
Hi,
CHQ have provided quantities for furniture items for us to include. I have carried out a check against the drawings and there appear to be a couple of discrepancies:
Medium meeting room has 6 chairs required these are not included in the schedule which only includes for 14no
Retreat 1 & 2 do not appear to have chairs allocated in the quantities.
Training room chairs their are 4 more included in the schedule than are shown on the drawings.
Can you confirm if you are happy for us to quote to the quantities in the schedule or allow for what is shown on drawings ?
Answered on 22/Aug/2025 10:27 AM
:
The response to your inquiry will be available in the new addendum.
27/Aug/2025 10:39 AM
Question
:
1. Following our recent communications and to help facilitate the construction costs for the Chermside New Lease Fit Out (VP472941), our best next step is to provide you with a comprehensive design and floor plan proposal. This proposal will outline our suggested layout and design elements, which will then allow us to develop accurate construction cost estimates for your review.
Please let us know if you require any further information from our end to proceed with this, or if there are any specific aspects you would like us to focus on in the design. We are eager to move forward and ensure a smooth process for this project.
2. As a business, Total Fitouts South Brisbane is yet to complete any government instructions. Is there still a requirement to complete referees?
3. Total Fitouts South Brisbane is part of a Franchise system, can the examples of recent work be provided by members of the network?
4. Can we have access to the preferred supplier panel prior to the tender submission due date?
5. Is there a specific platform that is required to be used to produce the GANNT chart or can we utilise our internal system, Buildxact?
6. If a Subcontractor no longer wishes to perform the work after the tender has been submitted/accepted, can they be replaced? If so, what's the process?
7. Is Professional Indeminity insurance required if Design Services are being subcontracted out?
8. Can we be provided with the Cm3 invitation to complete certification prior to the submission due date.
Answered on 27/Aug/2025 02:31 PM
:
Please refer to the published addendum for the responses.
01/Sep/2025 12:45 PM
Question
:
RFI regarding the Electronic Strike units to doors, are they all individual and require a fire trip to each door or will they all go back to 1 control unit that we already trip or a new controller where 1 trip would release all doors with electronic strike units?
Answered on 02/Sep/2025 01:00 PM
:
We have attached a new addendum that addresses your inquiry.
01/Sep/2025 01:05 PM
Question
:
Hi,
can you provide a response to the below RFI please.
For the Electronic Strike units to doors, are they all individual and require a fire trip to each door or will they all go back to 1 control unit that we already trip or a new controller where 1 trip would release all doors with electronic strike units?
Answered on 02/Sep/2025 01:02 PM
:
We have attached a new addendum that addresses your inquiry.
02/Sep/2025 01:41 PM
Question
:
Hi,
Could I please request the base build CAD files for the ground level (including carpark) and level 2, and any other structural services and architectural base build drawings or relevant fitout guides.
Thanks
Answered on 03/Sep/2025 07:32 AM
:
Please refer to the new addendum.
Updates made to this Request
11/Aug/2025 09:10 AM
Please note: The following attachments and addenda have been recently added.
1. Added: Attachment C - CHQ_097_2025_as4300-tender-form v2.docx
2. Added: Attachment F - CHQ_097_2025_Request_to_attend_Site_Visit v2.docx
3. Added: (Addendum) CHQ 97 2025 Addendum 01.pdf
Please consider these attachments and addenda when responding.
14/Aug/2025 10:31 AM
Please note: The following addendum has been recently added.
1. Added: (Addendum) CHQ 97 2025 Addendum 02.pdf
Please consider this addendum when responding.
14/Aug/2025 12:05 PM
Please note: The following addendum has been recently added.
1. Added: (Addendum) CHQ 97 2025 Addendum 03.pdf
Please consider this addendum when responding.
14/Aug/2025 12:07 PM
Please note: The following attachment has been recently added.
1. Added: Attachment I_Chermside_FFE Specifications Sheet (v3 - 14.8.25).xlsx
Please consider this attachment when responding.
18/Aug/2025 02:32 PM
Please note: The following addendum has been recently added.
1. Added: (Addendum) CHQ 97 2025 Addendum 04.pdf
Please consider this addendum when responding.
20/Aug/2025 08:00 AM
Please note: The following addendum has been recently added.
1. Added: (Addendum) CHQ 97 2025 Addendum 05.pdf
Please consider this addendum when responding.
20/Aug/2025 01:02 PM
Please note: The following addendum has been recently added.
1. Added: (Addendum) CHQ 97 2025 Addendum 06.pdf
Please consider this addendum when responding.
21/Aug/2025 10:04 AM
Please note: The following attachments and addenda have been recently added.
1. Added: (Addendum) CHQ 97 2025 Addendum 07.pdf
2. Added: eHQ RCDD Report - Chermside Galleria Level 2.pdf
Please consider these attachments and addenda when responding.
22/Aug/2025 10:41 AM
Please note: The following addendum has been recently added.
1. Added: (Addendum) CHQ 97 2025 Addendum 08.pdf
Please consider this addendum when responding.
26/Aug/2025 01:56 PM
Please note: The following attachments and addenda have been recently added.
1. Added: (Addendum) CHQ 97 2025 Addendum 09.pdf
2. Added: EL-005B REV AB.pdf
Please consider these attachments and addenda when responding.
27/Aug/2025 02:29 PM
Please note: The following attachments and addenda have been recently added.
1. Added: (Addendum) CHQ 97 2025 Addendum 10.pdf
2. Added: Attachment I_Chermside_FFE Specifications Sheet (v4 - 27.8.25).xlsx
Please consider these attachments and addenda when responding.
28/Aug/2025 12:41 PM
Please note: The following addendum has been recently added.
1. Added: (Addendum) CHQ 97 2025 Addendum 11.pdf
Please consider this addendum when responding.
02/Sep/2025 12:34 PM
Please note: The following addendum has been recently added.
1. Added: (Addendum) CHQ 97 2025 Addendum 12.pdf
Please consider this addendum when responding.
03/Sep/2025 07:42 AM
Please note: The following attachments and addenda have been recently added.
1. Added: (Addendum) CHQ 97 2025 Addendum 13.pdf
2. Added: A935-01d A0 (1).pdf
3. Added: A935-02d A0 (1).pdf
4. Added: EL-005B REV AB.pdf
5. Added: HAC 00147-M-020 [D].pdf
6. Added: HAC 00147-M-021 [C].pdf
7. Added: HAC 00147-M-022 [D].pdf
8. Added: HAC 00147-M-023 [D].pdf
9. Added: HAC 00147-M-024 [B].pdf
10. Added: Level 2 As Installed.dwg
Please consider these attachments and addenda when responding.
08/Sep/2025 11:24 AM
Please note: The following attachments and addenda have been recently added.
1. Added: (Addendum) CHQ 97 2025 Addendum 14.pdf
2. Added: Attachment D - Returnable Pricing Response Schedule v.2.xlsx
3. Added: CHQ VPD Evidence Requirements Guide.pdf
Please consider these attachments and addenda when responding.