Tender Details
Bushfire Hazard Tree Removal
Business Name
Mount Alexander Shire Council
VP Reference #
VP525178
Buyers Reference #
M2026-50
Opens
Thursday 10 September 2026 (AUS Eastern Standard Time)
Closes
Thursday 01 October 2026 02:00 PM (AUS Eastern Standard Time)
Supplier query cut-off
Wednesday 30 September 2026 02:00 PM (AUS Eastern Standard Time)
Expected decision
Thursday 08 October 2026 (AUS Eastern Standard Time)
Buyer Details
Business Name
Mount Alexander Shire Council
Location
27 Lyttleton St
Castlemaine, Victoria 3450
Australia
WebSite:
http://www.mountalexander.vic.gov.au/
Business Info
Mount Alexander Shire Council
Contact Details
The buyer has elected to have their personal and contact details hidden. These details will be revealed at the buyers discretion.
What the buyer is requesting
Details
Mount Alexander Shire Council (MASC) incurred significant damage to trees during the January 2026 Harcourt and District bushfires with a high number of hazard trees assessed and removed within the initial MASC Disaster Response. A secondary assessment of roadside hazard trees undertaken by MASC in August 2026 identified many of the retained trees impacted by the fire event are dead/unviable/hazardous with appropriate works programmed.

Online Tenderer Information Session (Non-mandatory)

Time and Date: 1pm, Wednesday 16 September 2026

Teams Link: https://teams.microsoft.com/meet/436203422219079?p=76ZDjfLlxu3AoFbxAL

RSVP: procurement@mountalexander.vic.gov.au
Attachments to this Request
Documents
5
Supplier lists selected
Lists
  • Forestry
  • Horticulture & Arboriculture
Categories selected
Categories
  • Forestry
    1: Forestry Management Services
    2: Harvesting & Haulage
  • Horticulture & Arboriculture
    1: Arborists & Tree Services
Regions of Service
Locations
  • Victoria
    1: Loddon

All Regions of Service locations are within Australia.
Information requested by others
15/Sep/2026 04:42 PM
Question:
Can council please provide a list or map showing the locations of the 280 full tree removals & 40 deadwood/stem reduction trees. If available can the list include basic information such as road name, GPS coordinates, tree size DBH and height etc.

Answered on 16/Sep/2026 12:18 PM:


Additional information will be provided to attendees during the online information session to be held at 1pm, today (16 September) and information from this session collated and issued to all potential tenderers via VendorPanel.

A link to access the online information session is included in the tender documents.
23/Sep/2026 02:22 PM
Question:
Can council please clarify Schedule 3. The introductory sentence states that Rates must be fully inclusive of labour and other oncosts, however the Schedule also has separate labour rate line items.

Can Council please confirm whether plant and equipment rates are to cover the plant item and operating costs only, with operator labour charged separately under the applicable labour rate?

Answered on 28/Sep/2026 11:16 AM:


An updated Schedule 3 has now been issued as an addendum and now includes the relevant items logwood processing and transportation and make, model capacity for proposed plant and equipment.
28/Sep/2026 03:21 PM
Question:
Thank you for issuing the updated Schedule 3. However Schedule 3 is still prefaced with the statement: rates must be fully inclusive of all oncosts, including labour.

Can Council please confirm whether:

A. each Plant Item rate is to include the operator,

OR

B. the rate should cover the plant item and its operating costs only, with operator time charged separately under the applicable labour rate?

Answered on 29/Sep/2026 11:15 AM:


Council can confirm:

Each Plant Item Rate should cover the plant item and its operating costs only with operator time charged separately under the applicable Labour rate i.e. Plant Operator.
17/Sep/2026 10:07 AM
Question:
Could Council please confirm the required disposal locations and/or nominated stockpile locations for all logwood and mulch generated as part of the Bushfire Hazard Tree Removal works? Additionally, could you please confirm whether all generated mulch is required to be removed from site, or whether mulch may be retained or dispersed at nominated locations within the works area at Council’s direction.

Answered on 29/Sep/2026 01:02 PM:
(edited on 29/Sep/2026 05:04 PM)


• Retention of logwood on roadsides for habitat is likely priority. Firewood processing likely minimal: 5-10% of total trees removed.

• Some mulch will be retained on site, the remainder to be transported to a site in either Castlemaine, Harcourt or Barkers Creek as directed.
22/Sep/2026 11:52 AM
Question:
Could Council please confirm the nominated disposal and/or stockpile locations for all logwood and mulch generated through the Bushfire Hazard Tree Removal works?

Could Council also please clarify whether all generated mulch is required to be removed from each work site, or whether mulch may, at Council’s direction, be retained, dispersed or stockpiled at nominated locations within the works area?

Answered on 29/Sep/2026 01:02 PM:
(edited on 29/Sep/2026 05:05 PM)


• Retention of logwood on roadsides for habitat is likely priority. Firewood processing likely minimal: 5-10% of total trees removed.

• Some mulch will be retained on site, the remainder to be transported to a site in either Castlemaine, Harcourt or Barkers Creek as directed.
Updates made to this Request
22/Sep/2026 05:09 PM
The closing date for this tender has been extended by 1 week to 2pm, Thursday 1 October 2026.

Additional information is being compiled and will be issued as a separate addendum following last week's information briefing session. Tenderers are required to submit their tender based on this updated information.

28/Sep/2026 11:14 AM
Please note: The following addenda have been recently added.

1. Added: (Addendum) Meeting Notes - Tender M2026-50 Bushfire Hazard Tree Removal.docx

2. Added: (Addendum) Response Schedules M2026-50 Addendum Issue.docx

3. Added: (Addendum) RFT M2026-50 - Bushfire Hazard Tree Removal - September 2026 - Addendum Issue.pdf

Please consider these addenda when responding.