Tender Details
Remove and Replace Roof Structures, Opal Street WTP Filters
Business Name
Central Highlands Regional Council
VP Reference #
VP527411
Buyers Reference #
RFT260100
Opens
Tuesday 29 September 2026 (E. Australia Standard Time)
Closes
Wednesday 23 December 2026 02:00 PM (E. Australia Standard Time)
Supplier query cut-off
Wednesday 16 December 2026 02:00 PM (E. Australia Standard Time)
Expected decision
Tuesday 23 March 2027 (E. Australia Standard Time)
Buyer Details
Business Name
Central Highlands Regional Council
Location
65 Egerton St
Emerald, Queensland 4720
Australia
WebSite:
https://www.centralhighlands.qld.gov.au/
Business Info
The Central Highlands region is in Central Queensland, Australia. The region encompasses an area of around 60 000 square kilometres, making it just short of the size of Tasmania.

It is home to around 30 000 people who live in the thirteen unique communities of Arcadia Valley, Bauhinia, Blackwater, Bluff, Capella, Comet, Dingo, Duaringa, Emerald, Rolleston, Sapphire Gemfields, Springsure and Tieri.

Our region is rich in minerals and agriculture, thriving on irrigation sourced from water storage on the Nogoa and Comet rivers. We claim the largest sapphire-producing fields in the Southern Hemisphere.

Major freight routes through the region include the north-south link between Charters Towers and northern New South Wales—identified as the inland transport alternative between Cairns and Melbourne.
Contact Details
The buyer has elected to have their personal and contact details hidden. These details will be revealed at the buyers discretion.
What the buyer is requesting
Details
Central Highlands Regional Council operates the Opal Street Water Treatment Plant (WTP) located in Emerald, Queensland. The WTP incorporates four rapid gravity sand filters which form a critical component of the potable water treatment process.

Each filter is currently protected by an individual structural steel roof structure. Over time, these roof structures have deteriorated and are approaching the end of their serviceable life. In addition to their deteriorated condition, the existing roof structures do not adequately facilitate the operational requirements associated with periodic filter media replacement.

During future filter media replacement campaigns, one-tonne bulk sandbags are required to be lowered into the filter compartments via crane. The existing roof structures do not provide suitable openings through which these bags can be safely lowered into the filters. This creates operational difficulties and increases risk during maintenance activities.

Central Highlands Regional Council is seeking responses from suitably qualified and experienced contractors to undertake the design, removal, disposal, supply and construction of replacement roof structures over the four rapid gravity filters.

The replacement roof structures must incorporate suitable access openings that facilitate the future lowering of one-tonne bulk bags of filter media into each filter compartment by others under a separate contract.

The Works are to be delivered under a Design and Construct Contract.

The Contractor must provide all labour, design services, engineering services, supervision, plant, equipment, materials, transport, certifications and incidentals required to complete the Works.

The Works include, but are not limited to:

• Site inspection and verification of existing conditions.

• Detailed design of replacement roof structures for four rapid gravity sand filters.

• Structural design certification by a Registered Professional Engineer of Queensland (RPEQ).

• Preparation and submission of design documentation and drawings.

• Attendance at, facilitation of and incorporation of feedback from an 80% design review workshop with Central Highlands Regional Council Water Utilities personnel. The Contractor must present theproposed design, demonstrate how operational requirements have been addressed, and provide draft design documentation for review prior to finalisation of the design.

• Removal and lawful disposal of existing roof structures. This includes the temporary covering of the sand filter opening to avoid any contaminants entering the filter media.

• Supply and installation of new roof structures.

• Provision of access openings to facilitate future filter media replacement activities.

• Supply and installation of all structural steelwork, roofing, flashings, lighting, stormwater runoff piping to prevent filter contamination, fixings and protective coatings.

• Final inspection and commissioning.

• Provision of as-constructed drawings and documentation.

• Handover of the completed Works.

The Contractor must be responsible for delivering a complete and fit-for-purpose solution.

Prior to commencing work on site, the Contractor must prepare, submit, revise and implement project-specific management plans suitable for the Works, including safety/WHS, environmental, quality, demolition, construction methodology/site management and traffic/pedestrian/access management plans, as applicable.



The replacement of filter media is specifically excluded from this Contract and will be undertaken by others under a separate contract.

Where the Opal St WTP Filter Media Replacement technical specification prepared by AECOM is provided with this RFT, only Sections 3.0 Materials and Construction, 4.0 Design and Documentation and 5.0 Roof Structure Removal and Reinstatement apply to this Contract, and only to the extent relevant to the design, removal, disposal, supply and construction of replacement roof structures. All other sections of that document are provided for information only unless expressly referenced in this Specification. In the event of inconsistency, this Specification takes precedence.

The Contractor must supply all labour, supervision, engineering services, design services, plant, equipment, materials, transport, temporary works and incidentals necessary to complete the Works.

The Works must be undertaken at the Opal Street Water Treatment Plant, Opal Street, Emerald, Queensland.

The Contract will commence within 7 days after the Award Letter and Contractual Arrangement are provided to and signed by the successful Contractor. Central Highlands Regional Council anticipates the contract end date to be as per the approved contract schedule.
Background information / Compatibility requirements
Details
Site Inspection 8 October 2026 11:00 am Opal St WTP, Emerald

Relevant Experience 20%

Tenderer’s Resources 10%

Demonstrated Understanding 15%

Development of Competitive Local Business and Industry 5%

Price 50%
Questions asked by the buyer
Question 1 - [Required]
Did you attend the compulsory site inspection?
Attachments to this Request
Documents
11
Supplier lists selected
Lists
  • Building Trade, Repairs, Maint.
  • Construction & Operation
  • Engineer, Research, Tech services
  • Water & Sewage
Categories selected
Categories
  • Building Trade & Repairs & Maintenance Services
    1: Roofing Services
    2: Water Treatment Services
  • Construction & Operation
    1: Building Construction Materials & Services
    2: Demolition Services
    3: Other Civil Construction Materials & Services
  • Engineering & Research & Technical Based Services
    1: Drafting Services
    2: Engineering Consulting Services
  • Water & Sewage
    1: Water & Sewage Treatment Plant Construction
Regions of Service
Locations
  • Queensland
    1: Fitzroy

All Regions of Service locations are within Australia.
Information requested by others
07/Oct/2026 12:24 PM
Question:
Hi,

Could we please register the following attendees for the site visit, Thursday, 8 October 2026.

- Gary Wheeler Gary.Wheeler@duratec.com.au

- Ashley MacDonnell Ashley.MacDonnell@duratec.com.au

Thank you.

Answered on 07/Oct/2026 01:01 PM:


Hi Grace, I have registered Gary and Ashley's attendance. Thank you.
07/Oct/2026 01:06 PM
Question:
Please Add Alex Jones the list for tomorrow

Alex@ammpd.com.au

Answered on 07/Oct/2026 01:09 PM:


Hi Alex, you have been registered for tomorrow site inspection. Thank you.
08/Oct/2026 04:16 PM
Question:
Good day,

Thanks for the Site visit.

Can you clearly define the Battery limits on the Existing concrete structure.

The RFT says the contractor’s design must include verification of the existing support structures, foundations, dimensions, levels, interfaces and affected services.

This as stated is no small task and I am unsure of the intent. Due to the level of movement of the structure that was noted and commented on by CHRC rep it is evident that the current foundations have had issues. Further to this The AECOM specification is relevant here because it actually contains a dedicated “Concrete Rehabilitation” section, covering concrete breakout/removal, exposed reinforcement treatment, substrate preparation, repair materials, reinstatement, finishing, curing, inspection and testing. So I need to understand a clear battery limit.

The design requirements also explicitly say the new roof design must “include lighting and rainwater disposal.”

Can you please provide the Design or Design intent for both of these items. Where is the power coming from? Has the engineering been completed? What lights do you require and where? How many of them? Where is the rain water to go? What are the tie in points? Sorry but the CHRC Rep was not aware of any of the details.

The CHRC Rep was of the understanding that these roof structures were to fully enclose the WTP filters down and sealed onto the concrete, completely sealed from wind and rain water, also vermin proff. Please confirm this is the intent that a fully sealed area is required not just replacement roof structures.

Can you confirm the expected shutdown/staging arrangement? Can only one complete filter pair/two cells be taken offline at a time, and must each filter be completely returned to service before the next roof is removed?

What is the maximum allowable outage for each filter? Is there a preferred low-demand period or particular months when Council wants construction undertaken?

Are there existing structural drawings for all four filter concrete structures? We understand the filters were built at different times and may not be identical.

Does Council have a preferred new roof arrangement? Skillion, gable, similar to existing, or is the geometry entirely contractor-designed?

What corrosion protection system does Council expect for the structural steel? Is hot-dip galvanising acceptable/preferred, or is a duplex/coating system required? The new design has a minimum 25-year service-life requirement.

Please clarify exactly how Council expects the two access openings per filter to operate. Must operators be able to physically open them without mechanical lifting equipment, or is crane removal of a roof cassette acceptable?

Is the specified minimum 2 m × 2 m clear opening required for each individual filter cell without exception?

How does Council envisage the one-tonne bulk bags being lowered through the roof? What crane/telehandler will normally be used, and from which side of each filter?

If removable roof sections are acceptable, does Council require permanent certified lifting points and a documented lifting procedure?

What permanent working-at-heights system is expected? Static line, fall-arrest anchors, ladder attachment points, roof access walkway, or simply engineered attachment provisions?

What temporary protection is required over the open filters during demolition and construction? Does Council require a rigid engineered cover, sealed membrane system, or another defined standard?

Can a reusable temporary filter cover be moved progressively from Filter 1 to Filter 4, or does Council require multiple covers to be available simultaneously?

Are there contamination-control requirements beyond physically covering the filter? For example restrictions on grinding, hot work, galvanised material handling, drilling, dust generation or chemicals near an operating filter.

Can we perform hot works above/adjacent to the filters once an approved temporary cover is fitted? Or does Council expect essentially all cutting/welding to be completed off site?

Where can cranes be positioned for each of the four filters? We need to establish available radius and likely crane capacity.

Are there known underground services beneath the proposed crane/outrigger locations? Can Council supply service plans?

Does Council have information on pavement/ground bearing capacity for crane outriggers? If not, what verification will be required?

Who performs plant isolations — Council operators or AMM? What notice period is required?

Is condensation underneath the roof currently an issue? Does Council expect insulation or anti-condensation roof backing?

Answered on 14/Oct/2026 09:00 AM:


Good morning, Council will be issuing an addendum to the scope of works and providing additional technical information. The closing time for submissions will be extended to include a 3-week tender period after the revised documents are issued. Council anticipates that the new documents will be issued 3 weeks from today. Thank you, CHRC
13/Oct/2026 02:07 PM
Question:
Hi Council,

We are reviewing the submission requirements and seeking clarification regarding the tender response and returnable documentation.

The tender package includes both the "RFT260100-Part_3-Tender_Response-Final" document and the separate "Returnables" schedules. Several of the requirements appear to overlap, and it is unclear whether tenderers are required to complete both sets of documents.

For example, Section 2.6 of the Tender Response document requests an attachment labelled "2.6 - Conflict of Interest", while the Returnables include a separate document titled 3 1 - S11 Conflict of Interest, which contains a Conflict of Interest Declaration.

Could Council please confirm whether:

1. Tenderers are required to complete and submit both the Tender Response document and all Returnable schedules; or

2. The Returnable schedules are intended to satisfy the corresponding requirements within the Tender Response document.

We would appreciate clarification to ensure our submission is compliant with the requirements.

Thank you.

Answered on 14/Oct/2026 09:00 AM:


Good morning, Council will be issuing an addendum to the scope of works and providing additional technical information. The closing time for submissions will be extended to include a 3-week tender period after the revised documents are issued. Council anticipates that the new documents will be issued 3 weeks from today. Thank you, CHRC
23/Oct/2026 02:58 PM
Question:
Will the re-issued documents include the price schedule mentioned in Part 3?

Answered on 27/Oct/2026 09:38 AM:


Good morning Zebediah, the pricing schedule has now been uploaded.
06/Nov/2026 03:22 AM
Question:
Given the extension of the closing date to 27 November 2026, will the Principal arrange an additional site inspection for prospective tenderers who were unable to attend the compulsory inspection on 8 October 2026? If not, please confirm whether tenders from parties who did not attend the 8 October inspection will be considered.

Answered on 06/Nov/2026 09:48 AM:


Hi Adekunle, Council is not proposing to arrange an additional compulsory site briefing at this stage, it should be noted that the reason for the delay is that the scope is being redefined. Once the revised scope is released, tenderers will be encouraged to arrange a site inspection.
10/Nov/2026 10:43 AM
Question:
Can we please arrange a site inspection as we were not contacted for this after the initial inspection 08/10/26 - Paul Butterfield High Risk solutions - pb@highrisksolutions.com.au - 0499 949 466

Answered on 11/Nov/2026 07:48 AM:


Hi David & Paul, thank you for your follow-up. Council is currently in the process of refining the scope of works. Upon release of the updated documentation, suppliers will have the opportunity to attend a non-compulsory site inspection (date to be confirmed).
Updates made to this Request
30/Sep/2026 08:21 AM
Please note: The following addendum has been recently added.

1. Added: (Addendum) Part 4 - Design & Construct (Major Works) - Final.pdf

Please consider this addendum when responding.

07/Oct/2026 08:48 AM
**Please register your attendance for the site inspection tomorrow 08/10/2026 at 11:00 am for RFT260100 via VendorPanel by 5:00 pm 07/10/2026**

14/Oct/2026 09:02 AM
Council will be issuing an addendum to the scope of works and providing additional technical information. The closing time for submissions will be extended to include a 3-week tender period after the revised documents are issued.

Council anticipates that the new documents will be issued 3 weeks from today.

27/Oct/2026 09:37 AM
Please note: The following addendum has been recently added.

1. Added: (Addendum) RFT260100 Annexure Part G - Price_Schedule_Final_Protected.xlsx

Please consider this addendum when responding.

03/Nov/2026 08:01 AM
Council is still investigating technical aspects and will be issuing an addendum to the RFT providing additional information in due course. The closing date for submissions will be extended by four weeks from 25 November to 23 December 2026.