Tender Details
001400_Demolition of Remaining Western Campus & Remediation
Business Name
James Cook University
VP Reference #
VP515985
Buyers Reference #
001400
Opens
Tuesday 07 July 2026
(E. Australia Standard Time)
Closes
Wednesday 05 August 2026 03:00 PM
(E. Australia Standard Time)
CLOSED
Supplier query cut-off
Friday 31 July 2026 03:00 PM
(E. Australia Standard Time)
Expected decision
Friday 16 October 2026
(E. Australia Standard Time)
Buyer Details
Business Name
James Cook University
Location
James Cook Dr
Douglas, Queensland 4814
Australia
WebSite:
https://www.jcu.edu.au/
Business Info
James Cook University
Contact Details
The buyer has elected to have their personal and contact details hidden. These details will be revealed at the buyers discretion.
What the buyer is requesting
Details
This Request for Tender (RFT) seeks to engage a suitably qualified Principal Contractor under a Lump Sum Contract to complete the remaining demolition, asbestos removal, stockpile removal, validation and site remediation works at the former James Cook University (JCU) Western Campus and Western Halls (collectively referred to as the Western Campus throughout this Scope of Work) to facilitate future redevelopment opportunities.
Background information / Compatibility requirements
Details
The project follows the partial completion of demolition works undertaken under a previous contract. Following cessation of those works, the remaining demolition activities, asbestos containing materials (ACM), demolition debris, stockpiles, in-ground infrastructure and associated site conditions were assessed by Onterris. These investigations have been documented within the Asbestos Management Specification (AMS), Revision B and supporting technical reports, which form part of the Contract Documents.
Desired Outcomes ('Nice to haves', Conditions & Warranties, SLA's, Project benefits)
Details
Tender Site Visit - 10am Tuesday 14th July 2026
Tender Close Date - Wednesday 5th August 2026
Anticipated contract commencement - Monday 31st August 2026
Supplier lists selected
Lists
Building Trade, Repairs, Maint.
Construction & Operation
Waste Management & Landfill
Categories selected
Categories
Building Trade & Repairs & Maintenance Services
1: Building Maintenance & Services
Construction & Operation
1: Building Construction Materials & Services
2: Demolition Services
Waste Management & Landfill
1: Asbestos Removal
Regions of Service
Locations
Queensland
1: Northern
All Regions of Service locations are within Australia.
Information requested by others
08/Jul/2026 06:06 AM
Question
:
(supplier) will you require packaging for contaminated demolition waste
Answered on 08/Jul/2026 10:38 AM
:
Good morning,
All contaminated waste is to be wrapped and disposed of accordingly.
Thank you,
Hayley.
31/Jul/2026 12:37 PM
Question
:
Hi JCU tender team, we have some questions as follows:
1) Will the successful contractor be able to transverse between the stockpile site identified in the civil drawings to the demolition site using off-road articulated dump trucks?
2) Will the successful contractor be able to relocate uncontaminated concrete from demolition site to stockpile site for processing and loading trucks for export to external recycling centre?
3) The successful contractor can only assume that there is sufficient gravel in stockpile site to be able to cap the demolition site. Will JCU be in favour to crush the clean concrete from the demolition site at the stockpile site location to increase volume of capping material if needed? In lieu of exporting to recycling facility?
4) Are there existing fire hydrant points around James Cook Drive of Endeavour Drive to fill a non-registered moxy water cart for dust suppression for haul roads, stockpile site and the demolition site?
Answered on 05/Aug/2026 09:08 AM
:
Good morning,
Please see responses below:
1) This will depend on the proposed methodology and ability to traverse between each stockpiles without further spreading or worsening contamination but yes there should be sufficient space for larger plant. The alternative would be to separate the scope or works into individual zones which incorporate the stockpiles and remove these in a staged approach traversing only through areas/ paths of travel known to be free of any contamination.
2) As above, this will depend on the contractors methodology and ensuring contamination has been removed first or known not be contained within the material.
3) JCU will not support crushing on campus and prefer the existing stockpile at the rear of campus to be used as fill and compaction.
4) Yes, the existing fire hydrants have been left live for dust suppression and filling of water carts. Any relevant authority will have to be notified prior to using these hydrants.
Thank you,
Hayley.
Updates made to this Request
Updates
None...