Tender Details
ITT267 - Design and Construct Sports House - Sunshine Coast Stadium
Business Name
Sunshine Coast Council
VP Reference #
VP524145
Buyers Reference #
ITT267
Opens
Saturday 05 September 2026 (E. Australia Standard Time)
Closes
Tuesday 20 October 2026 12:00 PM (E. Australia Standard Time)
Supplier query cut-off
Thursday 15 October 2026 12:00 PM (E. Australia Standard Time)
Expected decision
Monday 18 January 2027 (E. Australia Standard Time)
Buyer Details
Business Name
Sunshine Coast Council
Location
54 First Ave
Maroochydore, Queensland 4558
Australia
WebSite:
https://www.sunshinecoast.qld.gov.au/
Business Info
The Mayor and councillors work closely with the Executive Leadership Team and staff to deliver a range of plans and strategies that guide the delivery of major projects across the region, and council’s capital works program. Council remains committed to its vision for the Sunshine Coast: to be Australia’s most sustainable region – healthy, smart, creative.
Contact Details
The buyer has elected to have their personal and contact details hidden. These details will be revealed at the buyers discretion.
What the buyer is requesting
Details
Sunshine Coast Council (Council) is seeking to engage an experienced and appropriately qualified Principal Contractor to design and construct a new Sports House within the Sunshine Coast Stadium, located at 31 Sportsmans Parade, Bokarina.

The scope of work includes electrical enabling works, demolition of the existing building, and the design and construction of a new Sports House on largely the same footprint.

Design Works will include, but not be limited to:

• Preliminary Design;

• Detailed Design;

• Council Review meetings;

• All approvals, and permits;

Construction Works will include, but not be limited to:

• Enabling works comprising electrical infrastructure amendments;

• Demolition of the existing Sports House;

• Construction of a new Sports House;

• Civil works as required to adjust levels;

• Full remediation of the demolition site;

• Landscape and full remediation of the construction site;

Council is looking to engage one Principal Contractor to undertake the entire scope of works. The successful Contractor will be required to provide all materials, plant and labour, and to perform all necessary operations of whatever kind, to ensure the successful completion of the works associated with this Contract.

It is anticipated that works will commence in December 2026, with a duration of approximately 15 months.

An information session will be held on site as per the details set out below in Schedule 2.
Attachments to this Request
Documents
41
Supplier lists selected
Lists
  • Construction & Operation
Categories selected
Categories
  • Construction & Operation
    1: Building Construction Materials & Services
Regions of Service
Locations
  • Queensland
    1: Sunshine Coast

All Regions of Service locations are within Australia.
Information requested by others
08/Sep/2026 03:16 PM
Question:
Good afternoon,

Could you please confirm whether there is a minimum PQC prequalification level required for this tender?

Thank you.

Regards,

Answered on 09/Sep/2026 12:58 PM:


There is no PQC prequalification level required for this tender. Respondents are required to have the appropriate QBCC building licencing to construct a building of this complexity. All other capability and experience and financial capacity will be assessed in line with the Tender Response Form Criteria.
09/Sep/2026 01:08 PM
Question:
Hi, We were just wondering if modular construction is an option for this project?

Answered on 10/Sep/2026 09:33 AM:


Council is not considering a modular construction for this project.
09/Sep/2026 03:31 PM
Question:
Will the Council consider a modular solution?

Answered on 10/Sep/2026 09:34 AM:


Council is not considering a modular construction for this project.
Updates made to this Request
15/Sep/2026 11:01 AM
Please note: The following addenda have been recently added.

1. Added: (Addendum) ITT267 Additional Attachment Geotechnical Report Fields 1_2_5_6.PDF

2. Added: (Addendum) ITT267 Additional Attachment Survey and Contour + Service Location.PDF

3. Added: (Addendum) ITT267 Notice to Respondents 1.pdf

Please consider these addenda when responding.

15/Sep/2026 11:56 AM
Please note: The following addenda have been recently added.

1. Added: (Addendum) ITT267 Meeting Minutes of Information Session.pdf

2. Added: (Addendum) ITT267 Notice to Respondents 2.pdf

3. Added: (Addendum) REVISED ITT267 Schedule 6 - Appendix 3 - Contract Departures and Assumptions Schedule.DOCX

Please consider these addenda when responding.

17/Sep/2026 11:07 AM
Please note: The following addendum has been recently added.

1. Added: (Addendum) ITT267 Notice to Respondents 3.pdf

Please consider this addendum when responding.

21/Sep/2026 02:48 PM
Please note: The following addenda have been recently added.

1. Added: (Addendum) ITT267 Additional Attachment Clubhouse Ground Floor Plan.PDF

2. Added: (Addendum) ITT267 Additional Attachment Clubhouse Plans 2006.PDF

3. Added: (Addendum) ITT267 Additional Attachment Clubhouse Upper Floor Plan.PDF

4. Added: (Addendum) ITT267 Notice to Respondents 4.pdf

5. Added: (Addendum) ITT267 Additional Attachment Clubhouse Plumbing Drainage Plans.PDF

Please consider these addenda when responding.

22/Sep/2026 02:40 PM
Please note: The following addendum has been recently added.

1. Added: (Addendum) ITT267 Notice to Respondents 5.pdf

Please consider this addendum when responding.

28/Sep/2026 02:01 PM
Please note: The following addendum has been recently added.

1. Added: (Addendum) ITT267 Notice to Respondents 6.pdf

Please consider this addendum when responding.