Tender Details
Principal Contractor Engagement - Southport Health Precinct Acute Mental Health Refurbishment
Business Name
GCHHS - Asset Management Services
VP Reference #
VP497948
Buyers Reference #
GCHHS131253
Opens
Thursday 12 February 2026 (E. Australia Standard Time)
Closes
Friday 13 March 2026 05:00 PM (E. Australia Standard Time) CLOSED
Supplier query cut-off
Thursday 12 March 2026 05:00 PM (E. Australia Standard Time)
Expected decision
Friday 24 April 2026 (E. Australia Standard Time)
Buyer Details
Business Name
GCHHS - Asset Management Services
Location
1 Hospital Blvd
Southport, Queensland 4215
Australia
WebSite:
https://www.goldcoast.health.qld.gov.au/
Business Info
Manage end-to-end procurement, including category management and sourcing for buildings and plant (including maintenance) as well as biomedical equipment, ensuring value for money, supplier innovation, and compliance with Queensland Health procurement policy
Contact Details
The buyer has elected to have their personal and contact details hidden. These details will be revealed at the buyers discretion.
What the buyer is requesting
Details
Southport Health Precinct Acute Mental Health Refurbishment
Supplier lists selected
Lists
  • Building Trade, Repairs, Maint.
  • Construction & Operation
Categories selected
Categories
  • Building Trade & Repairs & Maintenance Services
    1: Air Conditioning Maintenance & Services
    2: Building Maintenance & Services
    3: Cabinet Making
    4: Carpentry & Joinery Services
    5: Data Cabling Services
    6: Fire Equipment & Maintenance Services
    7: Floor Coverings
    8: Glazing Supplies & Services
    9: Hydraulic Services
    10: Locksmith Supplies & Services
    11: Other Maintenance & Services
    12: Painting Supplies & Services
    13: Plastering
    14: Plumbing Maintenance Supplies & Services
    15: Roofing Services
    16: Tiling
    17: Windows coverings
  • Construction & Operation
    1: Building Construction Materials & Services
    2: Drainage Services
    3: Other Civil Construction Materials & Services
Regions of Service
Locations
  • Queensland
    1: Brisbane
    2: Gold Coast

All Regions of Service locations are within Australia.
Information requested by others
16/Feb/2026 01:30 PM
Question:
Good afternoon,

Can you please advise if the below documents will be issued as they appear to be missing from the tender package.

Mechanical drawings - Stage 2

ME-CD-500

ME-CD-502

ME-CD-510

ME-CD-550

ME-CD-560

ME-CD-570

Thank you in advance

Answered on 17/Feb/2026 09:21 AM:


Good morning,

The listed documents are all stage 2 scope. As we are not going ahead with stage 2 there is no requirement for these documents.

Kind Regards

GCHHS
19/Feb/2026 11:13 AM
Question:
Hi,

Drawing 01.41 shows a new drug fridge to the treatment room (REFDRG), this is listed as Group1, builder to supply and install, however no specification has been provided.

Can you confirm if this is to be supplied by us and if so what model is required.

Many thanks

Answered on 19/Feb/2026 12:51 PM:


Good afternoon,

GCHHS can confirm to remove the supply and install of the drug fridge.

Kind Regards

GCHHS
19/Feb/2026 09:56 AM
Question:
Hi Team,

Could you please check with the service consultant and send the missing drawings throught? According to the 24038_GCC Gold Coast ACMHS SHP_Project Document Register_Tender [260115].

Electrical:

A/E-301 A1 ACMHS-LEVEL 5 - SECURITY AND NURSE CALL LAYOUT - Stage 2.

Mechanical:

ME-CD-500 ACMHS STAGE 2 COVERSHEET, DRAWING LIST & NOTES REV A

ME-CD-502 ACHMS STAGE 2 EQUIPMENT SCHEDULES REV A

ME-CD-510 ACHMS STAGE 2 CHILLED WATER SCHEMATIC REV A

ME-CD-550 ACMHS STAGE 2 LEVEL 5 DEMOLITION HVAC PLAN REV A

ME-CD-560 ACMHS STAGE 2 LEVEL 5 PROPOSED HVAC PLAN REV A

ME-CD-570 ACHMS STAGE 2 DETAILS SHEET REV A


Architectural Drawings:

AR DD 2.90 A1 Stage 2 - Door Schedule & Signage T1. Or has it been merged into the 1.90 Stage 1 - Door schedule T2?

Best Regards

Sally

Answered on 19/Feb/2026 10:02 AM:
(edited on 19/Feb/2026 01:32 PM)


Good afternoon,

The first part of this question has already been responded to previously. Please advise if this information is needed again.

Regarding AR DD 2.90 - GCHHS advise yes that is correct. If the staffroom scope is awarded the idea is to use the same specification of door from stage 1 which is in the new doors section

Kind Regards

GCHHS
19/Feb/2026 08:59 AM
Question:
Hi Team,

Nice to meet you yesterday and could you please help with the following RFIs.

1. Are there any preferred or incumbent contractors for the building? Such as the BMS contractor or service contractors.

2. Building approval by client or builder.

3. Is builder's responsibility to engage the current architectural and service designer to complete the design development for construction? Or the client will engage them directly. Including hydraulic service drawings.

4. Will you accept alternative group 1 workstations and loose furniture?

5. Working hours. Can we do noisy works in normal hours? or must be in after hours.

6. Could you please provide the base building fitout guide for reference if available?

Best Regards

Sally


Best Regards

Answered on 19/Feb/2026 09:13 AM:
(edited on 20/Feb/2026 06:23 AM)


Good morning

Please see responses below:

1. Are there any preferred or incumbent contractors for the building? Such as the BMS contractor or service contractors.

Read page 6 of ‘ 24038_AR.DD.90.01 Finishes, FFE and Furniture [T1]’

2. Building approval by client or builder.

Client.

3. Is builder's responsibility to engage the current architectural and service designer to complete the design development for construction? Or the client will engage them directly. Including hydraulic service drawings.

GCHHS has the Principal Consultant (Archipelago) engaged for the construction stage to issue for-construction drawings and respond to any RFIs.

Please clarify which hydraulic service drawings are required? One existing handwash basin is to be removed and capped in the storage room (Stage 1 Scope) . The staffroom (stage 2) sink is designed to remain in the same location.

4. Will you accept alternative group 1 workstations and loose furniture?

If alternative workstation specification meets the same requirements as specified, then GCHHS don’t have an issue with alternatives should there be a significant cost saving. GCHHS would request the product information be submitted for review before accepting any alternatives, including warranty information.

5. Working hours. Can we do noisy works in normal hours? or must be in after hours.

Yes, all works submitted to the principal via the NIA process. Refer to the ‘Permits to Works’ section of the PPR document.

6. Could you please provide the base building fitout guide for reference if available?

No Base build fit out guide available.
20/Feb/2026 11:22 AM
Question:
Good morning,

I have sent an email to GCHHS.AMS.CMW@health.qld.gov.au with attention to Sue Bassett as our RFI requires screenshots.

Please advise if there is an alternate email address to send these through to.

Thanks in advance.

Answered on 23/Feb/2026 06:08 AM:


Good morning,

Please see responses below:

1. Please confirm details for SHV002 – Custom plant shelf / privacy screen item. There are 3 off noted on tab 19-FF&E of the Pricing Schedule (see capture below) but no description found in the Finishes, FFE and Furniture Schedule for Stage 1-Refurbishment.

Answer - Do not price, this was removed from scope.

2. There is a conflicting description of WST160a on tab 19-FF&E of the Pricing Schedule and the Finishes, FFE and Furniture Schedule (see captures below) for Stage 1-Refurbishment. Can you please confirm which one is correct?

Answer: Remove code S.J as this is supposed to resemble WST002a and WST002b which are missing. Please use updated pricing schedule in Addendum 1 which reflects this update.

Kind Regards

GCHHS
24/Feb/2026 09:25 AM
Question:
Is it possible to arrange a stie inspection with our contractors to ensure accuracy within our tender submission?

Answered on 24/Feb/2026 09:42 AM:


Good morning,

GCHHS are happy to facilitate another site visit for Sub-contractors. Please ensure numbers are kept to as low as possible.

This will be held on Friday 27th March 2026 at 10am. Meeting place to be the same point as last time.

Please email through names of all attendees to the address provided in the RFQ.

Kind Regards

GCHHS
24/Feb/2026 01:31 PM
Question:
Can you please confirm that only Stage 1 is in scope of works and stage 2(Staff room refurbishment) will not be in scope.

Can you also confirm if the incumbent ( for GCHHS Projects)

Fire: Bris fire

Security: Siemens

Nurse call : Rauland's

BMS: Schnider


Regards

Abhinav

Answered on 25/Feb/2026 05:57 AM:


Good morning,

Stage 1 forms the main scope of works, and Stage 2 is not included in the current scope. Gold Coast Hospital and Health Service (GCHHS) has requested that contractors provide a separate cost for the staffroom scope, which was originally part of Stage 2. Please refer to the documents posted on Vendor Panel.

Read page 6 of ‘ 24038_AR.DD.90.01 Finishes, FFE and Furniture [T1) for incumbent vendors

Regards

GCHHS
24/Feb/2026 02:45 PM
Question:
Hi,

The provided pricing schedule which contains Bill of Quants states that we should allow to replace 30% of existing ceiling tiles. This is not noted on the drawings anywhere, can you confirm if this is still a requirement for us to include within our pricing ?

Many thanks

Answered on 25/Feb/2026 09:27 AM:


Good morning,

Please see response below:

The contractor should allow for the replacement of ceiling tiles as required, including any tiles damaged during the renovation works and those requiring replacement due to wall realignment, etc.

We have allowed approximately 30% in our cost plan; however, as the exact extent is not yet known, we cannot nominate a specific area. It would be preferable for them to include an allowance based on their own assessment, experience with similar projects, and their understanding of the scope involved.

Regards

GCHHS
25/Feb/2026 11:42 AM
Question:
Could you please confirm the nurse call scope as outlined in the Pricing_Schedule_Stage_1–Refurbishment document under the “18 – Communications & Security” tab? Specifically, it notes a request to relocate four (4) nurse call points and overdoor lights.

For clarity,

•
R.J – Nurse Call

•
R.K – Relocate nurse call push buttons (Qty: 4)

•
R.L – Relocate nurse call indicator lights (Qty: 4)

Could you also please confirm the existing nurse call system brand currently installed?

Answered on 25/Feb/2026 12:03 PM:


Good afternoon,

Correct, refer to electrical document ‘A-E-300_ACMHS - Security and Nurse Call Layout - Stage 1 [T1]’

Contact incumbent security contractor ‘Securecom’ for specifications/ quote.

Regards

GCHHS
27/Feb/2026 02:25 PM
Question:
Can you please provide the size and brand specification for the drug fridge ?

Answered on 02/Mar/2026 07:09 AM:


Good morning,

As per Tender RFI#2, The drug fridge is removed from the builder’s scope.

Kind Regards

GCHHS
02/Mar/2026 08:48 AM
Question:
Good morning,

Can we please request an extension of time of 1 x week as some of our trades are very busy at present and need extra time, this would be much appreciated.

Thank you

Answered on 03/Mar/2026 07:18 AM:


Good morning,

Extension of Time request has been granted.

New closing date for this tender for all vendors submitting is Friday the 13th of March 2026 5.00pm

Kind Regards

GCHHS
02/Mar/2026 11:53 AM
Question:
Hi,

We would like to request a 1-week EOT to properly cover the desirable evaluation criteria as per section 1.7.2 of the Request for Quotation document, please.

Answered on 03/Mar/2026 07:18 AM:


Good morning,

Extension of Time request has been granted.

New closing date for this tender for all vendors submitting is Friday the 13th of March 2026 5.00pm

Kind Regards

GCHHS
02/Mar/2026 12:00 PM
Question:
Good morning,

Can you advise the incumbent Mechanical contractor, as the incumbent list in document 24038_AR.DD.90.01 Finishes, FFE and Furniture does not confirm who it is, we note there is minimal works so would you accept a prov Sum?

Thank you

Answered on 02/Mar/2026 01:37 PM:


Good afternoon,

No incumbent mechanical contractor. A provisional sum is acceptable; however, if awarded, evidence of any claims against the provisional sum will be required (e.g., quotations and invoices for completed works).

Kind Regards

GCHHS
03/Mar/2026 10:45 AM
Question:
Please see below RFI for the above-mentioned project.

1. Fire Services

a. FireBoar is listed as the Nominated Subcontractor for the Fire Services. On the issued tender drawings for Stages 1 and 2, all fire detection items are shown in green which the staging legend states existing equipment to remain? I just want to confirm if there is any fire service changes Fire Boar needs to quote for? Please clarify.

Answered on 03/Mar/2026 01:50 PM:


Good afternoon,

We wish to advise there is not addition or changes to dry fire services.

Kind Regards

GCHHS
09/Mar/2026 02:31 PM
Question:
Can You please confirm the scope for Fire Services for Stage 1 and Staff room ? It just states minor adjustments.

Please confirm that no mechanical service, Communication, Nurse call, data and Security services required for Staff room refurb?

Answered on 10/Mar/2026 07:37 AM:


Good morning,

GCHHS advises the below:

Part 1 - As per design there is no install of new dry fire detection. Minor adjustments meaning some detectors may need to be relocated.

Part 2 - Correct, none of these required for the staffroom refurb.

Kind Regards

GCHHS
09/Mar/2026 03:21 PM
Question:
Hi,

Can you confirm if we should allow for Peter Eustace Consulting Engineers (PECE) to create new as-built drawings for this project ?

Many thanks

Answered on 10/Mar/2026 07:34 AM:


Good morning,

GCHHS advises that yes allowance should be made for this

Kind Regards

GCHHS
Updates made to this Request
23/Feb/2026 06:11 AM
Please note: The following attachment has been recently added.

1. Added: Addendum 1 Pricing Schedule Stage 1 - Refurbishment A.xlsx

Please consider this attachment when responding.

Kind Regards

GCHHS

23/Feb/2026 06:14 AM
Good morning

Re: Addendum 1 - 1. Please use the updated pricing schedule for ‘Stage 1 – Refurbishment A’. Please double check quantities against the tender issue drawings. Note* 3x additional WST150 included as group 1 items replacing proposed existing straight desks in interview rooms. Quantity changed from 4 to 7.

Kind Regards

GCHHS

02/Mar/2026 09:41 AM
The following attachment has been recently added.

1. Added: Addendum 2.docx

Please note that in document “24038_AR.DD.01.90 Stage 1 – Door Schedule [T2]”, the comments section instructs the contractor to purchase and install the GCH cylinder.

Update* GCH has already procured a spare cylinder for this door. Therefore, purchase of the cylinder is not required. Please allow for installation only in your submitted price.

Please also note that all remaining door hardware is to be supplied and installed by the contractor.


Please consider this attachment when responding.

Kind Regards

GCHHS

04/Mar/2026 11:21 AM
Addendum #3

Hi Everyone,

Please note there is an error in the tender design documentation regarding the communications installer qualification. It was incorrectly stated as Simeon qualified.

The communications contractor must be CommScope qualified.

Kindly disregard any reference to Simeon qualified, as this should read CommScope qualified.

This error is noted in the following documents:

• A-E-002_ACMHS - Specification Sheet 1 of 2 [T1]

• A-E-003_ACMHS - Specification Sheet 2 of 2 [T1]

• 24038_AR.DD.90.01 Finishes, FFE and Furniture [T1]

Kind Regards

GCHHS

13/Mar/2026 08:54 AM
The following attachment has been recently added.

1. Added: SHP-AR-0500-PDF.pdf

Please note facilities have approved use of existing amenities as shown in attached to the nominated contractor with the expectation that these are kept in good condition and cleaned.

Kind Regards

GCHHS