Tender Details
Contract 2025998 Design & Construction of Ophir Road, Ophir - Traffic Bridge
Business Name
Cabonne Shire Council
VP Reference #
VP523376
Opens
Monday 31 August 2026 (AUS Eastern Standard Time)
Closes
Wednesday 30 September 2026 12:00 PM (AUS Eastern Standard Time) CLOSED
Supplier query cut-off
Friday 25 September 2026 12:00 PM (AUS Eastern Standard Time)
Expected decision
Wednesday 11 November 2026 (AUS Eastern Standard Time)
Buyer Details
Business Name
Cabonne Shire Council
Location
Main St
Cudal, New South Wales 2864
Australia
WebSite:
https://www.cabonne.nsw.gov.au/Home
Business Info
Cabonne Country, "Australia's Food Basket", is a rich rural shire in central west NSW, covering the towns of Canowindra, Cargo, Cudal, Cumnock, Eugowra, Manildra, Molong and Yeoval. The area is home to the site of Australia's first gold rush and is famous for ballooning, food and wine, agriculture and mining.
Contact Name
Nyssa Smith
Position:
Executive Assistant - Cabonne Infrastructure
Primary phone:
02 6390 7123
Mobile phone:
None Provided
Fax number:
None Provided
Email:
nyssa.smith@cabonne.nsw.gov.au
What the buyer is requesting
Details
Council is seeking tenders from appropriately qualified and experienced contractors for the Design and Construction of Ophir Road, Ophir - Traffic Bridge.

All plant, equipment, labour and materials required for the construction will be supplied by the successful Tenderer as part of the Contract. The work shall be completed as a minimum to Australian Standards, the National Construction Code and Cabonne Council standards and provide long-term functionality. The construction work associated with this project shall be completed on time, within budget and without incidents.
Supplier lists selected
Lists
  • Construction & Operation
Categories selected
Categories
  • Construction & Operation
    1: Bridge Construction & Maintenance
    2: Drilling & Boring Services
    3: Piling Services
Regions of Service
Locations
  • New South Wales
    1: Central West

All Regions of Service locations are within Australia.
Information requested by others
01/Sep/2026 02:03 PM
Question:
Is there a Pre-Tender site meeting? Thank you

Answered on 03/Sep/2026 01:45 PM:


Yes. The details of the pre-tender meeting are contained with the documents, specifically the Conditions of Tendering, item 5.2.
03/Sep/2026 02:12 PM
Question:
Dear Council,

1) Can the council please provide the geotechnical report and clause 4.6 of S3 Scopes of works technical criteria.

2) Can the council also please provide the pavement design criteria.

3) Will the council please confirm the set of specifications for road design and construction.

Thank you.

Answered on 09/Sep/2026 09:09 AM:


1. Geotechnical report and associated documents are included in the tender documentation, refer to document - Doc A1. and A2.

2. Section 4.5.1 Scope of works document outlines road approaches to align with concept design chainages. AADT for Ophir Rd is approx 350. Bridge construction specifications are included in the tender documentation, whereas an addendum will be issued to tenderers with the TfNSW specifications for road design and construction applicable to this project.
14/Sep/2026 03:02 PM
Question:
Could DOLRE be put forward as one of the bridge barrier options for this project? With its crash tested design, low deck loads and modular construction, it could simplify the design and installation compared with other solutions.

Answered on 14/Sep/2026 04:07 PM:


The current specification does not call for any barrier system due to the potential inundation and topping of the new structure. The contract is also for a design and construct (D&C) which would require suppliers of proprietary products liaise direct with the successful tenderer as Council is unable to promote any specific product.
22/Sep/2026 03:32 PM
Question:
Good afternoon,

JJR respectfully requests an extension to the tender closing date to allow sufficient time to finalise and review the submission.

JJR would appreciate Council’s consideration of extending the closing date, if practicable.

Kind regards,

Answered on 23/Sep/2026 12:10 PM:


Council is unable to extend the tender period at this point in time due to the delays this will pose in achieving a Council Resolution. The current program has tenders being awarded at the October 2026 Ordinary Council Meeting. Extending this will push this to the November meeting at the earliest which then puts further pressure on the construction and delivery program which states works must be completed by April 2027
23/Sep/2026 01:35 PM
Question:
Is it a mandatory requirement of this tender that the tenderer hold Current fully approved accreditation with Office of Federal Safety Commissioner?

Answered on 23/Sep/2026 03:51 PM:


No this is not a mandatory requirement Whilst the documentation states to provide the certification from the commissioner, it would be expected that tenderers either provide certificates of 3rd party accreditation, or if not accredited, a system that has been continually reviewed and could meet the audit requirements.
24/Sep/2026 02:49 PM
Question:
Hi,

Can you please clarify the traffic management requirements? It's understood the road is to be closed and traffic detoured for 30km, and that there's key tourist attractions, two separate LGAs, and Burrendong Way, a TfNSW route. Could you please clarify Council's expectations, ie, how many VMS boards are required, roughly how many detour signs are required, will we need to install signage on the TfNSW route (thus requiring TfNSW approval), will we need to gain approval from Orange Council, will static information signs be acceptable in lieu of VMS boards, etc.

Thanks

Answered on 25/Sep/2026 08:50 AM:


A TGS will need to be submitted to Council prior to approval and implementation, along with the relevant Sec.138 road ocupancy permits, which will determine the entire extent of the road road closure requirements. However, as a general guide, tenderers should allow for the supply of the following at a minimum:

1. 2 x VMS boards at the intersection of Ophir Road and Northern Distributor

2. 2 x VMS boards at the intersection of Burrendong Way and Northern Distributor

3. Multiple static repeater ""detour"" signs between Ophir Rd and Burrendong Way

4. Static ""Detour"" and repeater signage along Burrendong Way into Mullion Creek

5. Static ""Detour"" and repeater signage along Long POint Rd and into Lookout Rd

6. Static Road Closed (at Fourth crossing) signage along Ophir Rd at major interconnecting / cross roads

Cabonne Council project team will assist the successful tenderer with the coordination of the separate LGA's in securing the relevant road occupancy approvals.

A Road Occuapancy may be required as the Northern Distributor is a classified State Road, however as the project site is not in close proximity with this State Rd, tenderers will need to consider this with their associated traffic management provider, and if so apply for the ROL.

Additionally, the Fourth Crossing reserve, which is located on the northern side of the proposed bridge location, is a heavily utilised public facility and is to remain accesible at all times via this detour. No construction activity, stock piles, compuonds will be permitted in this reservce during construction.
Updates made to this Request
09/Sep/2026 11:22 AM
Please note: The following addenda have been recently added.

1. Added: (Addendum) Addendum 1_Design Construction Specifications Register.pdf

2. Added: (Addendum) Road Design and Construction Specifications.pdf

Please consider these addenda when responding.

11/Sep/2026 10:04 AM
Please note: The following addendum has been recently added.

1. Added: (Addendum) Addendum 2_Mandatory Site Meeting.pdf

Please consider this addendum when responding.