Tender Details
Construction of Concrete Pavement, Wash Bay And Beach Pit forWoorabinda Council Depot
Business Name
Woorabinda Aboriginal Shire Council
VP Reference #
VP526714
Buyers Reference #
T2026-025
Opens
Tuesday 22 September 2026 (E. Australia Standard Time)
Closes
Tuesday 13 October 2026 04:00 PM (E. Australia Standard Time)
Supplier query cut-off
Tuesday 13 October 2026 04:00 PM (E. Australia Standard Time)
Expected decision
Tuesday 20 October 2026 (E. Australia Standard Time)
Buyer Details
Business Name
Woorabinda Aboriginal Shire Council
Location
112 Munns Dr
Woorabinda, Queensland 4713
Australia
WebSite:
https://www.woorabinda.qld.gov.au/
Business Info
Woorabinda Aboriginal Shire Council is located in the heart of the business area of its' community and has approximately 76 employees, both Indigenous and Non-Indigenous.

The Councillors' future vision for Woorabinda, is that it becomes self-sustainable and self-managed; leading to the main focus on training.
Contact Details
The buyer has elected to have their personal and contact details hidden. These details will be revealed at the buyers discretion.
What the buyer is requesting
Details
The works include the construction of a new concrete pavement, a new wash bay area and beach pit construction in the existing Woorabinda Shire Council Workshop on 119 Carbibe Street ( 119SP268500). The Contractor shall undertake all construction works associated with the proposed civil infrastructure, including:

• Civil Earthworks

• Drainage and Gutter Upgrades

• Concrete Pavements and Hardstands

• Beach Pit Facility

• Hydraulic and Wash Bay Systems

The contract includes provisional sum items which are to be priced but their execution is to be directed by the client. Woorabinda Aboriginal Shire Council (the Principal) may either provide these directly or reserve the right to negotiate their provision with the Main Contractor as part of the Works Under Contract (WUC).

• Vehicle Shade Structures (Provisional Sums)

• Fencing and Access Control Works (Provisional Sums)
Background information / Compatibility requirements
Details
The intent is to engage a suitably qualified contractor to deliver high-quality work safely around daily use (which is an operational depot), that responds to operational needs, and relevant regulatory and safety standards. Works are to be coordinated to allow the depot workshop to remain operational. Works are to be completed in accordance with approved design documentation, applicable guidelines, and best-practice construction methods. The depot will remain operational throughout the construction period. The Contractor shall plan and stage the works to ensure minimal or uninterrupted access to workshops, plant storage areas and operational activities, whilst maintaining a safe working environment for Council staff and visitors.
Attachments to this Request
Documents
8
Supplier lists selected
Lists
  • Building Products & Materials
  • Building Trade, Repairs, Maint.
  • Construction & Operation
Categories selected
Categories
  • Building Products & Materials
    1: Concrete & Cement Products
    2: Plumbing Fixtures
  • Building Trade & Repairs & Maintenance Services
    1: Concreting
    2: Hydraulic Services
    3: Plumbing Maintenance Supplies & Services
    4: Roofing Services
  • Construction & Operation
    1: Drainage Services
    2: Pavement Stabilisation Services & Materials
Regions of Service
Locations
  • Queensland
    1: Central West
    2: Darling Downs
    3: Far North
    4: Fitzroy
    5: Gold Coast
    6: Mackay
    7: Northern
    8: South West
    9: Sunshine Coast
    10: West Moreton
    11: Wide Bay-Burnett

All Regions of Service locations are within Australia.
Information requested by others
30/Sep/2026 03:13 PM
Question:
Afternoon,

It appears there maybe a mistake in the project delivery dates :

Could you please confirm if the dates are as follows:

Tender Award 20 October 2026 ??

Site Possession 27 October 2026 ??

Planned start of construction 28 October 2026 ??

Practical Completion 30 March 2026

Thank you

Answered on 30/Sep/2026 03:30 PM:


Tender Award 20 October 2026 ??

Site Possession 27 October 2026 ??

Planned start of construction 28 October 2026 ??

Practical Completion 30 March 2027

We are aiming for March 2027 for PC.
Updates made to this Request
Updates
None...