Tender Details
DRFA Program Biloela Reconstruction
Business Name
Banana Shire Council
VP Reference #
VP527465
Buyers Reference #
T2627.08
Opens
Tuesday 29 September 2026
(E. Australia Standard Time)
Closes
Friday 30 October 2026 05:00 PM
(E. Australia Standard Time)
CLOSED
Supplier query cut-off
Friday 30 October 2026 05:00 PM
(E. Australia Standard Time)
Expected decision
Tuesday 29 December 2026
(E. Australia Standard Time)
Buyer Details
Business Name
Banana Shire Council
Location
Valentine Plains Rd
Biloela, Queensland 4715
Australia
WebSite:
https://www.banana.qld.gov.au/
Business Info
The Shire of Banana is a local government area located in the Capricorn region of Queensland, Australia, inland from the regional city of Gladstone. The shire was named after the first township in the region, which in turn was named for the burial site of a huge dun coloured bullock named 'Banana'.
Contact Details
The buyer has elected to have their personal and contact details hidden. These details will be revealed at the buyers discretion.
What the buyer is requesting
Details
Banana Shire Council invites Tenders from suitably qualified Tenderers for Reconstruction works of Biloela Reconstruction under DRFA Program in the locality of Biloela Area as described in more detail in Part 5 – Scope of Works.
Background information / Compatibility requirements
Details
The Scope of Works comprises this Scope of Works, including;
(a) Appendix A – General Specification
(b) Appendix B – Pricing Schedule and Scope of Works
(c) Appendix C1 – Locality Map
(d) Appendix C2 – Weeds Map
(e) Appendix D – Technical Specification
(f) Appendix E – QRA Treatment Guide 2020-21
(g) Appendix F – Minimum Traffic Signage
Desired Outcomes ('Nice to haves', Conditions & Warranties, SLA's, Project benefits)
Details
Work Cover
Insurance
Similar experience
Local Content
Supplier lists selected
Lists
Construction & Operation
Categories selected
Categories
Construction & Operation
1: Bridge Construction & Maintenance
2: Building Construction Materials & Services
3: Demolition Services
4: Drainage Services
5: Dredging
6: Drilling & Boring Services
7: Excavation Services
8: Grates
9: Other Civil Construction Materials & Services
10: Pavement Stabilisation Services & Materials
11: Piling Services
12: Road Building Products & Maintenance & Services
13: Track & Trail Construction
14: Underground Services
Regions of Service
Locations
New South Wales
1: Sydney
Queensland
1: Brisbane
2: Central West
3: Darling Downs
4: Far North
5: Fitzroy
6: Gold Coast
7: Mackay
8: North West
9: Northern
10: South West
11: Sunshine Coast
12: West Moreton
13: Wide Bay-Burnett
All Regions of Service locations are within Australia.
Information requested by others
06/Oct/2026 08:13 AM
Question
:
Good Morning,
The Mandatory flag has not been set as Yes or No for the briefing to be held tomorrow. Can you please advise if this is mandatory or not?
Thank you
Answered on 06/Oct/2026 02:06 PM
:
Hi James,
Attendance on tender briefing is not mandatory, however if your team are interested to join via teams to know more about this project then it will be always welcome.
Tender briefing teams meeting will be happened tomorrow 7th October 10.00 am.
Thanks.
06/Oct/2026 03:43 PM
Question
:
Afternoon,
Can you please provide a link to the Teams Meeting 07th October at 10am.
Thankyou
Answered on 07/Oct/2026 08:01 AM
:
Hi Michael,
Good morning.
Project officer will send you the meeting link soon.
Thanks.
07/Oct/2026 08:45 AM
Question
:
Good morning,
Could you please provide a link to the tender briefing for this morning?
Thanks
Answered on 07/Oct/2026 10:42 AM
:
Hi Jon,
your request already forwarded to project officer.
Thanks
15/Oct/2026 11:41 AM
Question
:
Good Morning, could it please be confirmed if gravel is to come from pit or commercial quarry for this tender? If from pit, can tenderers please be provided the relevant information to price accordingly. Thanks
Answered on 23/Oct/2026 02:13 PM
:
Hi,
Please check the notice 3 for question and answer.
Thanks
16/Oct/2026 09:17 AM
Question
:
Could you please confirm if an accountant letter is acceptable for Schedule B - (Financial Details of Respondent) of the Response Schedule. Thankyou
Answered on 19/Oct/2026 09:11 AM
:
Yes
16/Oct/2026 09:49 AM
Question
:
Please disregard previous question about accountant letter. Thankyou
Answered on 19/Oct/2026 09:28 AM
:
Noted and Thanks
18/Oct/2026 08:56 PM
Question
:
For the Biloela Reconstruction tender, please clarify the following so we can establish the treatment limits, road alignment and survey control:
Bore and test pit records: Please provide any Council, State or other government-issued borehole and test pit locations, coordinates, logs and investigation reports used to develop the road treatments. If no such records are available, please confirm.
Existing road materials: Please provide any previous testing of the existing pavement and formation materials on the scheduled roads, including pavement depths, grading, plasticity, CBR, moisture-density or compaction results, where available. Please identify the road, chainage and test location for each result.
Road centrelines and survey control: Please provide the approved formation or road centreline alignments in digital format, together with chainage origins, coordinate system and datum, benchmarks, survey control points, treatment widths and tie-in locations. If approved centreline data is unavailable, please confirm how the contractor is to establish the centreline from the existing formation and obtain approval of the proposed alignment before set-out.
These details are needed to price the survey and verification work and to establish the pre-disaster road arrangement required by the Technical Specification.
Answered on 23/Oct/2026 02:13 PM
:
Hi,
Please check the notice 3 for question and answer.
Thanks
20/Oct/2026 10:55 AM
Question
:
Q1; Can Council Please advise about the PC dates if there is any fixed date for it?
Q2; Can Council Please advise about the Gravel Pits mentioned in Locality Plan have got a compliance material ready to cart to site, Or The council want to source the local quarries for importing material, If Gravel pits are ready with material, please advise which gravel pits are those or if contractor needs to provide crusher for screening material please advise.
Thanks
Answered on 28/Oct/2026 11:58 AM
:
Hi,
Please see below the response of your query:
"The anticipated Practical Completion date for all eight packages is 29 October 2027 based on the estimated duration required to complete the overall program of works. Where a contractor is awarded an individual package or packages only, the applicable PC date will be established and confirmed in the contract award documentation.
The gravel pits identified on the locality plans are indicative only and are provided as a guide to potential material sources. No guarantee is provided regarding the availability, suitability or current condition of material at these locations. The contractor is responsible for identifying and sourcing suitable gravel materials, ensuring all materials comply with the requirements of the technical specification and determining the processing or screening requirements necessary to achieve compliance. This may include crushing or screening where required. Council approval must be obtained prior to using any proposed local gravel pit. Contractors are to allow for all necessary material sourcing, processing, testing and approvals when preparing their tender submissions."
Thanks.
20/Oct/2026 03:41 PM
Question
:
Could Council please provide any meeting minutes, briefing notes, presentation materials, attendance records, questions and answers, or other information issued following the tender briefing held on 7 October 2026 for Contract T2627.08 – DRFA Program Biloela Reconstruction?
Answered on 30/Oct/2026 08:00 AM
:
Hi,
Please check notice 5 information.
Thanks.
20/Oct/2026 04:30 PM
Question
:
1) Pit / Gravel Supply Clarification
The locality map indicates a borrow pit within the project vicinity. Can the Principal please clarify the intended arrangement for gravel/fill material supply?
Specifically:
Is the Principal supplying gravel, or providing access to a nominated borrow pit/source?
If Principal-supplied, please provide the borrow pit/quarry name, location/GPS coordinates, available material types, estimated reserves, and any applicable royalties or ownership details.
Please confirm responsibility for winning, processing, testing, loading, haulage, access maintenance, environmental approvals, rehabilitation, and any associated costs.
Alternatively, should the Contractor allow for sourcing and importing all required fill/gravel material from a commercial quarry under the Contract?
2) Could Council please provide any meeting minutes, briefing notes, presentation materials, attendance records, questions and answers, or other information issued following the tender briefing held on 7 October 2026 for Contract T2627.08 – DRFA Program Biloela Reconstruction?
Answered on 30/Oct/2026 07:55 AM
:
Hi,
please see below response-
"The borrow pits identified on the locality map are indicative only and are provided as a guide to potential material sources. Council is not supplying gravel material or guaranteeing the availability or suitability of materials from these locations. The contractor is responsible for sourcing and supplying all required gravel fill material, including any necessary winning, processing, screening, testing, loading/haulage and associated costs. All materials must comply with the requirements of the technical specification. Council approval must be obtained prior to using any proposed local borrow pit.
Contractors are to make their own enquiries regarding the availability and suitability of potential material sources and allow for all associated costs in their tender submissions.
The transcript from the tender briefing held is attached and will be made available to tenderers via VendorPanel."
Thanks.
21/Oct/2026 03:46 PM
Question
:
Requests clarification on permitted Sunday work for the Biloela Reconstruction works. We are assessing 10 days on / 4 days off, 2 weeks on / 1 week off, and 3 weeks on / 1 week off crew rosters. Sunday production may help maintain continuous pit, haulage and road work within each roster swing.
Please confirm:
Whether construction is permitted on Sundays and public holidays, and the approved working hours for each.
Whether Sunday work may include pit pushing and screening, truck haulage, gravel spreading, mechanical stabilisation, trimming, compaction and field testing.
Any restrictions on noise, dust, heavy-vehicle routes, pit access or work near residences on those days.
Whether Sunday inspections, testing and hold-point releases can be arranged, and the required notice.
Whether Sunday work requires a separate Council approval or a traffic management plan amendment, and who grants that approval.
Please advise whether the answer differs between Council roads and nominated material pits. We will use the confirmed working days and hours to finalise the construction program and roster pricing.
Answered on 23/Oct/2026 02:14 PM
:
Hi,
Please check the notice 3 for question and answer.
Thanks
23/Oct/2026 01:09 PM
Question
:
We request a two-week extension to the tender closing date for T2627.08 – DRFA Program Biloela Reconstruction (VP527465), from Wednesday, 28 October 2026 at 11:00 am to Wednesday, 11 November 2026 at 11:00 am AEST.
The additional time would allow us to complete our assessment of the revised technical specification and pricing schedule, resolve outstanding clarifications concerning water supply, pit access and material approvals, and finalise regional supplier quotations and the construction program.
Please confirm whether Council will grant the requested extension and issue the revised closing date.
Answered on 27/Oct/2026 07:30 AM
:
Hi,
“The Principal has approved a two day extension to the tender closing date, with tenders now closing on Friday 30th October. No further extension will be granted to ensure a fair and consistent tender process for all tenderers.
The revised tender closing date will be updated and reflected on VendorPanel”.
Regards,
Sajib
Updates made to this Request
06/Oct/2026 08:42 AM
Please note: The following attachments have been recently added.
1. Added: T2627.08 DRFA Program Biloela Construction Notice 1.docx
2. Added: T2627.08 DRFA Program Biloela Reconstruction - App A - General Specification.pdf
3. Added: T2627.08 DRFA Program Biloela Reconstruction - App D - Technical Specification.pdf
4. Added: T2627.08 DRFA Program Biloela Reconstruction - P4 - Contract - Construct Only.pdf
5. Added: T2627.08 DRFA Program Biloela Reconstruction - P5 - Scope of Works.pdf
Please consider these attachments when responding.
15/Oct/2026 08:26 PM
Please note: The following attachments have been recently added.
1. Added: T2627.08 DRFA Program Biloela Construction Notice 2.docx
2. Added: T2627.08 Biloela Area - App B - Schedule K1 - Rev 2.xlsx
3. Added: T2627.08 DRFA PROGRAM Biloela Recon - App D - Technical Specification Rev2.pdf
Please consider these attachments when responding.
23/Oct/2026 02:11 PM
Please note: The following attachment has been recently added.
1. Added: T2627.08 DRFA Program Biloela Construction Notice 3.docx
Please consider this attachment when responding.
26/Oct/2026 07:30 AM
Please note: The following attachment has been recently added.
1. Added: T2627.08 DRFA Program Biloela Reconstruction Notice 4.docx
Please consider this attachment when responding.
30/Oct/2026 08:01 AM
Please note: The following attachments have been recently added.
1. Added: T2627.08 Biloela - Tender Briefing Meeting Minutes.pdf
2. Added: T2627.08 DRFA Program Biloela Reconstruction Notice 5.docx
Please consider these attachments when responding.