Tender Details
Access this Tender
Construction works for Longreach Hospital Chillers Replacement Project
Business Name
Central West Hospital and Health Service
VP Reference #
VP533206
Opens
Monday 16 November 2026
(E. Australia Standard Time)
Closes
Monday 14 December 2026 05:00 PM
(E. Australia Standard Time)
Supplier query cut-off
Monday 14 December 2026 05:00 PM
(E. Australia Standard Time)
Expected decision
Monday 21 December 2026
(E. Australia Standard Time)
Buyer Details
Business Name
Central West Hospital and Health Service
Location
Central West Hospital & Health Service, 139 Eagle St
Longreach, Queensland 4730
Australia
WebSite:
http://www.centralwest.health.qld.gov.au
Business Info
Central West Hospital and Health Service
Contact Name
Libbi Dolgner
Position:
Procurement and Contract Officer
Primary phone:
46528041
Mobile phone:
None Provided
Fax number:
None Provided
Email:
libbi.dolgner@health.qld.gov.au
What the buyer is requesting
Details
Central West Hospital and Health Service (CWHHS) is seeking a suitably qualified and experienced mechanical services contractor to undertake the replacement of three existing air-cooled chillers at Longreach Hospital.
The works include the removal of the existing chillers and the installation, integration, testing and commissioning of three Principal-supplied Carrier 30RBP-670R air-cooled scroll chillers.
The successful contractor will be responsible for delivering all associated construction works required to provide a complete, fully operational and compliant chilled-water system. This includes coordinating the works within an operational hospital environment and minimising disruption to patients, staff and clinical services.
Expected timing: Construction required to be completed by 30 June 2027
Location: Longreach Hospital, Longreach, QLD, 4730
Tenderers must refer to the project specifications and drawings for the Longreach Hospital Chiller Replacement Project for detailed information regarding the scope, technical requirements, site conditions and contractor responsibilities.
The tenderer is responsible for reviewing all RFQ documentation and identifying any discrepancies, exclusions, assumptions or additional information required to deliver the works.
Background information / Compatibility requirements
Details
Three existing air-cooled chillers located at the Longreach Hospital have reached their end of life. Two Chillers have failed and one Chiller is currently operational.
Central West Hospital and Health Service (CWHHS) engaged Stantec to undertake the detailed design and development of the engineering specifications for the Longreach Hospital Chiller Replacement Project.
Due to the anticipated manufacturing lead times associated with the new Chillers, CWHHS procured the three Chillers directly as a separate procurement package.
Carrier 30RBP-670R Chillers were selected as the preferred option that meets CWHHS’ requirements.
The Chillers are estimated to arrive in Longreach in January 2027.
Desired Outcomes ('Nice to haves', Conditions & Warranties, SLA's, Project benefits)
Details
The desired outcome is the safe and timely replacement of the three existing air-cooled chillers with the Principal-supplied Carrier 30RBP-670R chillers, while maintaining continuity of critical hospital cooling services.
The completed system must be reliable, energy efficient, maintainable and fully integrated with the hospital’s electrical, chilled-water and building management systems. It must operate under Longreach climatic conditions and be delivered with complete commissioning records, verified performance, operator training, warranties, asset information and as-constructed documentation.
The works must minimise disruption to patients, staff and clinical services and provide effective contingency arrangements throughout all shutdowns and changeovers.
Questions asked by the buyer
Question 1 - [Required]
Describe the proposed methodology for delivering the works in an operational hospital environment. The response must address:
• mobilisation, site establishment and project governance
• verification of existing site conditions and interfaces before construction
• staging of enabling works, demolition, installation and changeover
• maintenance of adequate chilled-water capacity throughout the works
• proposed temporary cooling arrangements, including capacity, redundancy, monitoring, fuel or electrical supply, response times and contingency equipment
• proposed shutdowns and isolations, including required notice periods, duration, affected services and rollback arrangements
• communication and coordination with CWHHS Facilities, clinical representatives, the superintendent or contract administrator, Carrier and other contractors
• management of noise, vibration, dust, odour, access, deliveries and disruption to patients and staff
• emergency response arrangements if the remaining operation
Question 2 - [Required]
Provide a detailed construction program showing how the tenderer will complete the works within the required period. The program must identify:
• contract award
• mobilisation and site verification
• design review and constructability review
• shop drawings, product data and technical submissions
• approvals and hold points
• enabling works that can be completed before chiller delivery
• switchboard, controls, pipework and structural modifications
• temporary cooling mobilisation
• delivery, unloading, storage and inspection of the Principal-supplied chillers
• lifts and major logistics activities
• shutdowns and changeovers
• installation of each chiller
• BMS integration
• flushing, water treatment and balancing
• pre-commissioning and commissioning
• performance testing
• training, practical completion and handover
• defects-period activities.
Question 3 - [Required]
Tenderers should identify all key subcontractors and explain how their performance, availability and licensing will be managed. Substitution of nominated key personnel should require CWHHS approval and replacement with personnel of equivalent or better capability.
Question 4 - [Required]
Demonstrate how the works will be planned, managed and monitored to achieve the project requirements for time, cost and quality.
The response must address:
Time: Provide a project-specific Gantt chart identifying key activities, milestones, approvals, long-lead items, shutdowns, critical path and commissioning activities. Explain how progress, delays and recovery actions will be managed to achieve completion by 30 June 2027.
Cost: Describe the approach to cost control, including progress claims, forecasting, variations, provisional sums, latent conditions and management of subcontractor and supplier costs. Clearly identify all assumptions, exclusions and qualifications.
Quality: Describe the proposed quality assurance arrangements, including technical submissions, shop drawings, inspection and test plans, hold points, non-conformance management, commissioning, performance testing and defect rectification.
Handover: Explain how the contractor will manage training, warranties, as-constructe
Attachments to this Request
Documents
4
Supplier lists selected
Lists
Mechanical Plant, Equip, Services
Categories selected
Categories
Mechanical Plant & Equipment & Services
1: Air-Conditioning Maintenance Services
2: Air-Conditioning Systems
3: Building Management & Control Systems
4: Hydraulic Machinery, Equipment, Parts & Components
5: Mechanical Services
6: Refrigeration
Regions of Service
Locations
Queensland
1: Central West
2: North West
3: South West
All Regions of Service locations are within Australia.