CTWW001 - 26/27 - Burgowan WTP - Sludge Dewatering Facility - Construction Works
Business Name
Fraser Coast Regional Council
VP Reference #
VP525993
Buyers Reference #
CTWW001 - 2627
Opens
Friday 18 September 2026
(E. Australia Standard Time)
Closes
Thursday 26 November 2026 11:00 AM
(E. Australia Standard Time)
Supplier query cut-off
Sunday 22 November 2026 11:00 AM
(E. Australia Standard Time)
Expected decision
Monday 25 January 2027
(E. Australia Standard Time)
Buyer Details
Business Name
Fraser Coast Regional Council
Location
23 Main St
Pialba, Queensland 4655
Australia
WebSite:
http://www.frasercoast.qld.gov.au
Business Info
Fraser Coast Regional Council
Contact Details
The buyer has elected to have their personal and contact details hidden. These details will be revealed at the buyers discretion.
What the buyer is requesting
Details
OVERVIEW
Fraser Coast Regional Council is inviting offers from suitably qualified and experienced Tenderers for CTWW001 - 26/27 - Burgowan WTP: Sludge Dewatering Facility - Construction Works.
MANDATORY TENDER BRIEFING
A tender briefing is mandatory for this tender. The details are outlined below:
Date: Wednesday, 30 September 2026
Time: 1:00pm (AEST)
Location: Burgowan WTP (located off Torbanlea-Pialba Rd) Google Maps reference MJHW+89, Burgowan QLD 4659
Booking Required: YES
Point of Contact for Booking: Email - procurement@frasercoast.qld.gov.au
Other Details (incl. Dress Code / PPE): Long sleeved high visibility shirt; long pants; sun protection and eye protection
SUBMISSION OF TENDER DOCUMENTS
Please be advised that tender response forms are to be submitted as three files only and in the following format:
- Non-Price Response Form: PDF including all supporting documentation as one file. This PDF must not contain any price related criteria.
- Price Response Form: Excel
- Contract Amendments and Particulars: Excel
Failure to comply with this requirement may result in a non-conforming offer.
Attachments to this Request
Documents
36
Supplier lists selected
Lists
Water & Sewage
Categories selected
Categories
Water & Sewage
1: Pipes & Valves & Fittings
2: Water & Sewage Treatment Plant Construction
Regions of Service
Locations
Queensland
1: Wide Bay-Burnett
All Regions of Service locations are within Australia.
Information requested by others
25/Sep/2026 04:21 PM
Question
:
Good afternoon, can you please provide clarification for the following queries:
•Expected Contract Award Date: Could you please provide an indication of the expected contract award date?
•Cable Schedule: Please provide the latest cable schedule.
•Missing Documentation: We note that the following design documentation and drawings are currently missing:
-Drawing BEG382-01-TD-WR-DBA-0001
-Drawing BEG382-DW-EL-PLN-0093
-Electrical design reports.
Regards
Answered on 01/Oct/2026 03:40 PM
:
Please refer to Addendum #1
29/Sep/2026 01:55 PM
Question
:
Hi, Are you able to provide information on the following:
• Instrument schedule.
• Valve/solenoid schedule.
• Motor schedule.
• Cable schedules.
• A power system analysis.
• Control / process narrative for the PLC programming.
• Confirm that the motor starter cells are to be fixed type.
Answered on 01/Oct/2026 03:40 PM
:
Please refer to Addendum #1
29/Sep/2026 02:40 PM
Question
:
Good afternoon
Please see below our request of information:
1. Missing documentation: Could not locate the client issued 'Control Philosophy document'.
2. Request for the I/O list and the nominated CCTV subcontractor.
Can you please also respond to our previous RFI?
Regards
Answered on 01/Oct/2026 03:40 PM
:
Please refer to Addendum #1
01/Oct/2026 01:39 PM
Question
:
Please see our request for information below. Following our site visit, we reviewed the project documentation again to locate the missing drawings and documents, but we were unable to find the following items:
• the client-issued Control Philosophy Report
• the current I/O list and the details of the nominated CCTV subcontractor.
• the latest cable schedule.
Regards
Answered on 01/Oct/2026 03:41 PM
:
(edited on 02/Oct/2026 07:54 AM)
Please refer to Addendum #2
02/Oct/2026 01:47 PM
Question
:
Hi Fraser Coast Representative,
Can Fraser Coast please provide the following documents if available:
1. Instrument schedule or datasheets in excel format. Unable to find it in Tender Document 5.2d
2. Valve schedule or datasheets in excel format.
3. MIX8301 (Feed Averaging Tank Mixer) datasheet in excel format.
4. 3D file or DWG file of the site or an earthworks model - 12d or Autocad format, natural surface model and design surface model.
If possible, we request an extension of 3 weeks once the 3D file or DWG file or an earthworks model is provided to ensure accurate and efficient pricing for the submission.
Regards,
Answered on 07/Oct/2026 03:29 PM
:
Please refer to Addendum #3
02/Oct/2026 02:50 PM
Question
:
Hello,
We're preparing pricing for this project, and would be grateful if the Principal would consider a three-week extension to the closing date.
This pricing relies on supplier quotes for the custom-built 2,500 A main switchboard and motor control centres, the two 500 kW drives, and the PLC and instrumentation equipment. Suppliers need longer to price these items than the current tender period allows. The extra time would let us provide a complete and competitive price.
Thank you for considering our request.
Kind regards,
Alex
Answered on 07/Oct/2026 03:30 PM
:
Please refer to Addendum #3
06/Oct/2026 08:50 AM
Question
:
Hi,
Based on feedback received from a number of key suppliers and subcontractors, we are seeking a two-week extension to the tender closing date. Several parties have advised that they require additional time to finalise pricing and scope reviews.
Thank you for your consideration.
Answered on 07/Oct/2026 03:30 PM
:
Please refer to Addendum #3
06/Oct/2026 09:15 AM
Question
:
Hello Procurement Officer,
Greetings! We hope you are doing well. We would like to request for a 3-week extension of time (EOT) for the submission of the tender, in order for us and our affiliate suppliers/subcontractors to provide an accurate tender submission in consideration to the complexity of the work scope.
Hoping for your positive response on this request. Thank you!
Warm regards,
Answered on 07/Oct/2026 03:30 PM
:
Please refer to Addendum #3
06/Oct/2026 09:19 AM
Question
:
Hi,
Please see our request for information below -
A. In light of the decision to replace the TEMA PLC processor with a CJ3 PLC, we request Council consider descoping all works associated with the TEMA PLC Upgrade to allow for re-design and tendering of this portion of works at a future date. We believe this approach would ultimately deliver a more cost-effective outcome for Council. We do not require an extension of time to accommodate this significant change.
If the TEMA PLC upgrade is to remain within scope, can Council please confirm:
Is pricing still required for works per the IFC design of the TEMA PLC upgrade using the NJ processor? Or is this design now considered redundant?
We note the minimal effort required for electrical design given the mature state of the IFC design but recognise the significant engineering effort in migrating the existing PLC software to a new range. We also note the complexity of cutover between two ranges of hardware on an operating plant with a maximum 6hr shutdown window.
Is pricing now required for works per the minutes that a CJ3 processor is now to be used?
We note this would require a fresh electrical design of the hardware upgrade, negating the existing IFC design, but agree that there would be significant engineering savings in maintaining the existing PLC software on the CJ3 architecture. We also note the complexity of cutover will be reduced if the use of adaptor wiring kits are used to significantly reduce the re-wiring required. We also note the product is now scheduled for release Oct 2026. To-date OMRON have not been in a position to provide pricing or lead times on this product, but remain hopeful of providing prior to tender close.
If both pricing options are required, please confirm the format of response required.
B. Could not locate the following tender documents -
5.2.d
5.2.a
5.2.e
C. Can FCRC/KBR please:
Confirm Total cut and fill volumes (m³) for the bulk earthworks
Provide The 12d Model files /CAD files for the existing and design surfaces.
D. Pensar acknowledges Council's position that no extensions will be granted. However, following feedback from our key suppliers and subcontractors, we respectfully request an extension of three (3)
weeks, from 15/10/26 to 05/11/26.
Several suppliers, notably for the switchboards, have advised that they cannot provide firm pricing within the current period. An extension would allow a more accurate tender.
Answered on 07/Oct/2026 03:30 PM
:
Please refer to Addendum #3
06/Oct/2026 12:35 PM
Question
:
Could you please include a copy of the attendance that was noted in the minutes from the site briefing/mandatory meeting.
This would help us identify the attending contractors and provide relevant equipment information and pricing for their tender submissions.
If the full attendance sheet cannot be released, a list of the companies represented would be appreciated.
Answered on 07/Oct/2026 03:30 PM
:
Please refer to Addendum #3
08/Oct/2026 11:23 AM
Question
:
We are in receipt of your design model via addendum 4. Please provide your natural surface model at your earliest convenience. We require both the design and natural surface to produce quantities.
Answered on 08/Oct/2026 02:50 PM
:
Please refer to Addendum #5
09/Oct/2026 09:08 AM
Question
:
A number of drawings have been received in poor condition, making it difficult to measure from them and to understand their legends. Request the client reissue the following drawings:
• BEG382-01-DW-CV-PLN-0033/0
• BEG382-01-DW-CV-GEN-0130/0
• BEG382-01-DW-CV-PLN-0131/0
Answered on 16/Oct/2026 07:21 AM
:
Please refer to Addendum #6 and associated documents
09/Oct/2026 09:31 AM
Question
:
With reference to drawing PLN-0033/0, please confirm if the “Control Line MK11A Interface” detail is required against the asphalt pavement also. It is difficult to differentiate between the green of the pavement drains and the green of the subsoil drains.
Answered on 16/Oct/2026 07:21 AM
:
Please refer to Addendum #6 and associated documents
12/Oct/2026 01:53 PM
Question
:
Please provide drawings for the dewatering and transformer sites that show fence and gate alignments and details.
Answered on 16/Oct/2026 07:21 AM
:
Please refer to Addendum #6 and associated documents
13/Oct/2026 09:00 AM
Question
:
Hi - we are an electrical and control system integrator seeking to be involved in the delivery of this project for council. Is it possible that council could advise which proponents (companies) attended the mandatory site inspection.
Thanks
Answered on 16/Oct/2026 07:22 AM
:
Please refer to Addendum #6 and associated documents
13/Oct/2026 03:24 PM
Question
:
Hi, please see our request for information below -
supporting documentation and photos of the existing generator.
Answered on 16/Oct/2026 07:22 AM
:
Please refer to Addendum #6 and associated documents
14/Oct/2026 09:25 AM
Question
:
Generator 2 scope. The Scope of Works (6.4.6 and testing requirements) and Project Specification 17.5.3 call for a new second generator operating in parallel with the existing 880 kVA set, including load-sharing tests, and the civil items include generator slabs and fuel tank plinths. However, SLD BEG382-01-DW-EL-SLD-0001 Rev 0 shows Generator 2 as “Future” (Note 11), the Design Report (10.1.2) states the new generator and fuel system are designed by others, and the Price Response Form has no item for supplying a generator. Please confirm:
a) Is supply and installation of the second generator and its fuel system part of this Contract? If so, please advise the required rating and fuel autonomy, and which pay item it should be priced under.
b) If it is future, should tenderers allow for the Generator 2 feeder cables and the MSB incomer and changeover provisions now, with Generator 2 commissioning and load-sharing tests excluded?
c) Is the existing 880 kVA generator to be relocated into the new generator building under this Contract?
Power System Analysis report. Addendum 1 (Supplier Post #2) advised the Power System Analysis Report is in Tender Document 5.4.i, but it is not in the Principal Supplied Information issued. Could Council please re-issue it, and the PowerCAD model if available?
Answered on 16/Oct/2026 07:22 AM
:
Please refer to Addendum #6 and associated documents
14/Oct/2026 09:35 AM
Question
:
There are several drawing references to various material types that do not appear to be covered by the provided specifications. We request further details on these materials to ensure accurate pricing for the client. Drawing GEN-0201/0 references Controlled Fill, Granular Material Capping Layer and Granular Material. Drawing PLN-0038/0 references Improved Subgrade Material. Could the client provide further detail on the materials they are wanting?
Furthermore, drawing DTL-0032/0 references Earth Fill to MRTS04, which is quite broad. From the geotechnical results provided, the site cut looks to be typically Class C based on WPI. Is it the client’s intent to use the site won material as fill in this instance?
Answered on 16/Oct/2026 07:22 AM
:
Please refer to Addendum #6 and associated documents
19/Oct/2026 01:25 PM
Question
:
RFI01 - EOT Request
Hi Julianne,
We respectfully request an Extension of Time (EOT) for the submission of our tender for the Sludge Dewatering Upgrade Project, extending the current submission deadline of 5 November 2026 to 20 November 2026.
This extension is requested to allow sufficient time to obtain and assess vendor package pricing, receive outstanding subcontractor quotations, and develop a complete and accurate tender submission that adequately addresses the complexities and various elements of the project.
The current tender timeframe has presented several challenges, including:
• Vendor package pricing and lead times: The specialised nature of the sludge dewatering equipment requires engagement with multiple vendors to obtain compliant technical and commercial offers. Allowing sufficient time for vendors to review the project requirements and develop their submissions is essential.
• Subcontractor responses: A number of subcontractor quotations remain outstanding, with additional time required to obtain, review and clarify pricing to ensure all relevant scope elements are adequately covered.
• Limited supplier participation: Several suppliers have declined to provide pricing due to the short turnaround time available. This has restricted the number of competitive quotations received and increased the time required to identify and engage alternative suppliers.
• Project complexity and scope coordination: The project involves multiple interfacing elements, vendor packages and subcontracted works that require careful coordination to ensure the proposed solution is technically compliant and commercially complete.
• Tender accuracy and completeness: Additional time is required to review vendor and subcontractor submissions, reconcile scope gaps and exclusions, confirm pricing assumptions, and undertake a detailed internal review of the estimate and overall tender submission.
The requested extension will provide the necessary opportunity to obtain more complete and reliable pricing, properly assess the associated risks and exclusions, and ensure our final submission represents an accurate and considered offer that meets the project requirements.
We believe the additional time will support a more robust and competitive tender submission, reducing the likelihood of pricing omissions, scope gaps or assumptions that may otherwise affect the delivery and cost certainty of the project.
We therefore respectfully request approval to extend the tender submission deadline by 15 calendar days, from 5 November 2026 to 20 November 2026.
Thank you for your consideration of this request. We look forward to your response.
Kind regards,
Answered on 20/Oct/2026 08:00 AM
:
Please refer to Addendum #7
23/Oct/2026 08:21 AM
Question
:
RFI02 - Enquiry
Hi Julianne,
On review of the valves it was noticed some odd valve selection. Can council please clarify;
• Ball Valves for use on Sludge & Thickened Sludge/Solids
o While we can offer 100nb & 150nb ball valves with Gear Box, we cannot offer 200nb Ball Valves
o Suggest would use Gate Valves OR Plug Valves
o Gate Valves have been nominated on some sludge, yet ball valves on others. Can council please verify if gate valves would be suitable?
? Ie; Line 73 & 76, same application, same size Dn250 however different valve type, Ball & Gate”
Kind regards
Answered on 03/Nov/2026 03:49 PM
:
Please refer to Addendum #8
23/Oct/2026 08:55 AM
Question
:
Good morning
Please see our request for information below:
• In addition to the FD provided for the new plant, can FCRC, please provide the functional description for the existing plant also?
Best regards
Answered on 03/Nov/2026 03:49 PM
:
Please refer to Addendum #8
23/Oct/2026 09:31 AM
Question
:
Request that the client issue a better quality version of drawing DW-CV-GEN-0131/0 to enable the contractor to read and understand the conduit arrays. In addition: please identify the size and type of the two single conduit runs between the generator building and the switchroom and advise if the contractor is to allow for the various conduits marked as “HOLD #”?
Answered on 03/Nov/2026 03:49 PM
:
Please refer to Addendum #8
23/Oct/2026 11:05 AM
Question
:
Addendum #6, Supplier Post #14, indicates that fencing is only required for the following:
• Dewatering Building Area, as per drawings BEG382-01-DW-CV-GEN-0030 and BEG382-01-DW-PI-GEN-0021.
• Around the Ergon transformer pad (12 m x 12 m square) inclusive of a gate.
The Contractor seeks further information on the following:
• What is the required size and if there is any automation required for the gate in the Ergon transformer pad?
• The switchroom and generator area, the existing fence alignment appears to conflict with the proposed works, as it passes through the new concrete footpath, landscaped area, and road intersection. Please confirm the required fencing arrangement in this area.
• Are the vehicle access gates through the project to be manual or automatic? TMR Standard Drawing SD1602 Rev C shows manual gates; however, drawing BEG382-01-DW-CV-GEN-0030 notes that sensors are required to prevent the gates closing on a stationary truck. Please confirm the required gate operation and details.
Answered on 03/Nov/2026 03:49 PM
:
Please refer to Addendum #8
26/Oct/2026 04:30 PM
Question
:
Can the client please provide the long section for OD180 service water SWT-POLY-150-8801 shown on drawing PI-PLN-0092/0. This service appears to cross a number of existing asphalt/concrete driveways and interacts with the overhead power pole and the front gate. The long section will assist greatly in providing accurate pricing.
Answered on 03/Nov/2026 03:49 PM
:
Please refer to Addendum #8
26/Oct/2026 04:45 PM
Question
:
With reference to drawing DW-CV-PLN-0033/0, please confirm the type/s of subsoil drains required at the follow locations: 1. behind the retaining wall; 2. the two dark green drains (“subsoil drainage” per the drawing legend) directly to the south of the outloading bay (IL’s of 16.49 and 16.45); 3. the two light green drains (“pavement drainage” per the drawing legend) that exit into the existing roadway culvert.
Answered on 03/Nov/2026 03:50 PM
:
Please refer to Addendum #8
29/Oct/2026 11:52 AM
Question
:
RFI03 - Sludge Chemistry Data
Hi Julianne,
Can council please provide the sludge chemistry data for the plant. It is required for our vendors to accurately size the appropriate screw press equipment.
Kind regards,
Answered on 03/Nov/2026 03:50 PM
:
Please refer to Addendum #8
30/Oct/2026 09:26 AM
Question
:
There are two partial existing water mains shown on drawing CV-GEN-0132/0, one from the Existing Operator Building and one from the Existing Dewatering Facility, both run north-south and shown to finish at the fence line. BYDA and the Fraser Coast Regional Council online mapping service both show a watermain (potentially 450 diameter) running approximately north-south through the project. Could the client please confirm the location/s and any necessary treatment, protection required by the contractor?
Answered on 03/Nov/2026 03:50 PM
:
Please refer to Addendum #8
30/Oct/2026 09:46 AM
Question
:
BYDA poorly identifies a Telstra service within the worksite. Drawing CV-GEN-0130/0 illustrates a comms service with pit running under an existing tree (to be removed) and under the proposed works to the north of the switch room. Can the client please advise any protection/alteration works required?
Answered on 03/Nov/2026 03:50 PM
:
Please refer to Addendum #8
Updates made to this Request
01/Oct/2026 03:40 PM
Please note: The following addenda have been recently added.
1. Added: (Addendum) CTWW001 - 2627 - Burgowan WTP - Sludge Dewatering Facility - Construction Works - Addendum #1.pdf
2. Added: (Addendum) CTWW001 - 2627 - Burgowan WTP - Sludge Dewatering Facility - Construction Works - Mandatory Tender Briefing Minutes.pdf
Please consider these addenda when responding.
02/Oct/2026 07:54 AM
Please note: The following addendum has been recently added.
1. Added: (Addendum) CTWW001 - 2627 - Burgowan WTP - Sludge Dewatering Facility - Construction Works - Addendum #2.pdf
Please consider this addendum when responding.
07/Oct/2026 03:12 PM
Please note: The following addenda have been recently added.
1. Added: (Addendum) CTWW001 - 2627 - Burgowan WTP - Sludge Dewatering Facility - Construction Works - Addendum #3.pdf
2. Added: (Addendum) CTWW001 - 2627 - Burgowan WTP - Sludge Dewatering Facility - Construction Works - Cable Schedule and Instrument List.pdf
3. Added: (Addendum) CTWW001 - 2627 - Burgowan WTP - Sludge Dewatering Facility - Construction Works - DISCLAIMER.doc
4. Added: (Addendum) CTWW001 - 2627 - Burgowan WTP - Sludge Dewatering Facility - Construction Works - Earthworks_DTM.dwg
5. Added: (Addendum) CTWW001 - 2627 - Burgowan WTP - Sludge Dewatering Facility - Construction Works - Form 13 - Schedule of Tenchnical Details V2.XLSM
Please consider these addenda when responding.
08/Oct/2026 08:00 AM
Please note: The following addendum has been recently added.
1. Added: (Addendum) CTWW001 - 2627 - Burgowan WTP - Sludge Dewatering Facility - Construction Works - Addendum #4.pdf
Please consider this addendum when responding.
08/Oct/2026 02:37 PM
Please note: The following addendum has been recently added.
1. Added: (Addendum) CTWW001 - 2627 - Burgowan WTP - Sludge Dewatering Facility - Construction Works - Addendum #5.pdf
Please consider this addendum when responding.
16/Oct/2026 07:21 AM
Please note: The following addenda have been recently added.
1. Added: (Addendum) CTWW001 - 2627 - Burgowan WTP - Sludge Dewatering Facility - Construction Works - PSA report - 260826.PDF
2. Added: (Addendum) CTWW001 - 2627 - Burgowan WTP - Sludge Dewatering Facility - Construction Works - SG Energy Operation and Maintenance Manual (OM) -.PDF
3. Added: (Addendum) CTWW001 - 2627 - Burgowan WTP - Sludge Dewatering Facility - Construction Works - Addendum #6.pdf
4. Added: (Addendum) CTWW001 - 2627 - Burgowan WTP - Sludge Dewatering Facility - Construction Works - BEG382-01-DW-CV-PLN-0033_legend highlighting.pdf
5. Added: (Addendum) CTWW001 - 2627 - Burgowan WTP - Sludge Dewatering Facility - Construction Works - BRSQ-24209-EN-RPTPWR-01-A Power System Study.pdf
6. Added: (Addendum) CTWW001 - 2627 - Burgowan WTP - Sludge Dewatering Facility - Construction Works - FCRC BUR GEN.zip
7. Added: (Addendum) CTWW001 - 2627 - Burgowan WTP - Sludge Dewatering Facility - Construction Works - GEN130.pdf
8. Added: (Addendum) CTWW001 - 2627 - Burgowan WTP - Sludge Dewatering Facility - Construction Works - PLN033.pdf
9. Added: (Addendum) CTWW001 - 2627 - Burgowan WTP - Sludge Dewatering Facility - Construction Works - PLN131.pdf
10. Added: (Addendum) CTWW001 - 2627 - Burgowan WTP - Sludge Dewatering Facility - Construction Works - SG Energy Electrical Wiring Drawings - SGE-P888C.PDF
Please consider these addenda when responding.
20/Oct/2026 07:58 AM
Please note: The following addendum has been recently added.
1. Added: (Addendum) CTWW001 - 2627 - Burgowan WTP - Sludge Dewatering Facility - Construction Works - Addendum #7.pdf
Please consider this addendum when responding.
03/Nov/2026 03:47 PM
Please note: The following addenda have been recently added.
1. Added: (Addendum) CTWW001 - 2627 - Burgowan WTP - Sludge Dewatering Facility - Construction Works - Addendum #8 - BEG382-01-DW-CV-GEN-0131.pdf
2. Added: (Addendum) CTWW001 - 2627 - Burgowan WTP - Sludge Dewatering Facility - Construction Works - Addendum #8 - Red-line mark-up of PID.DOCX
3. Added: (Addendum) CTWW001 - 2627 - Burgowan WTP - Sludge Dewatering Facility - Construction Works - Addendum #8 - Updated Valve List - BEG382-TD-M.XLSX
4. Added: (Addendum) CTWW001 - 2627 - Burgowan WTP - Sludge Dewatering Facility - Construction Works - Addendum #8.pdf
Please consider these addenda when responding.