Tender Details
Access this Tender
ITT242 Civil Construction - Caloundra Transport Corridor Upgrade
Business Name
Sunshine Coast Council
VP Reference #
VP492876
Buyers Reference #
ITT242
Opens
Tuesday 03 March 2026
(E. Australia Standard Time)
Closes
Monday 08 June 2026 10:00 AM
(E. Australia Standard Time)
Supplier query cut-off
Wednesday 03 June 2026 10:00 AM
(E. Australia Standard Time)
Expected decision
Tuesday 06 October 2026
(E. Australia Standard Time)
Buyer Details
Business Name
Sunshine Coast Council
Location
54 First Ave
Maroochydore, Queensland 4558
Australia
WebSite:
https://www.sunshinecoast.qld.gov.au/
Business Info
The Mayor and councillors work closely with the Executive Leadership Team and staff to deliver a range of plans and strategies that guide the delivery of major projects across the region, and council’s capital works program. Council remains committed to its vision for the Sunshine Coast: to be Australia’s most sustainable region – healthy, smart, creative.
Contact Details
The buyer has elected to have their personal and contact details hidden. These details will be revealed at the buyers discretion.
What the buyer is requesting
Details
Tenders are invited for the civil construction of the Caloundra Transport Corridor Upgrade (CTCU).
The CTCU is made up of two sections – Section 1 and Section 2 with works under the Contract to incorporate, but not be limited to:
Separable Portion 1 - Caloundra Transport Corridor between Omrah Avenue and Industrial Avenue Nicklin Way -Section 1 and 2:
Section 1 (Works Package A)
Duplicating existing traffic lanes to provide two lanes in each direction on Oval Avenue and Third Avenue;
Connecting Oval Avenue with Omrah Avenue via existing Bowman Road;
Building a two-way cycle track and pedestrian pathways (to be referenced under the Contract as Works Package D.
Upgrading the following intersections to traffic signals to improve safety and traffic operations:
Bowman Road/Gosling Street
First Avenue/Oval Avenue
Third Avenue/Oval Avenue
Changes to traffic movements at the following locations:
First Avenue, Second Avenue and Third Avenue intersections with Oval Avenue
Nicholls Street and Gosling Street intersection
Suller Street, Cowan Street and Omrah Avenue intersections with Bowman Road
Installing new street lighting and landscaping.
Section 2 (Works Package B)
Arthur Street to Industril Avenue/Nicklin Way (referred to as the Nicklin Way/Third Avenue extension):
Extension of Third Avenue from Arthur Street to Nicklin Way including a two-way cycle track and pedestrian pathway;
Connection of Industrial Avenue to Nicklin Way;
A new intersection on Nicklin Way;
Upgrading the intersection of Arthur Street/Third Avenue to traffic signals to improve safety and traffic operations;
Installation new street lighting and landscaping.
Package D: CTCU Section 1 Cycle Track Infrastructure
Separable Portion 2
Arthur Street Drainage Upgrade (Works package C)
New box culvert along Arthur Street, from the new intersection of Arthur Street and Third Avenue, to outlet 350m east at Roy Henzell Park;
New box culverts crossing Arthur Street between Caloundra rugby fields and Roy Henzell Park.
Respondents are required to price all separable portions as it is Councils intention to award all portions to one Principal Contractor. Departure from this will constitute a non-conforming tender.
The Contractor must have and maintain for the life the Contract, Department of Transport & Main Roads (DTMR) pre-qualification to pre-qualification level R3, A3, and F50 to be eligible to provide a Tender Response and be considered for award of this Contract.
It is anticipated that a Contract will be awarded to single contractor in May/June 2026 with Practical Completion of the Works by December 2027. Council requires the section of the corridor between the Nicklin Way and Bowman Road to be Functionally Complete and open to traffic by December 2027. Key Performance Measures of the Contractor will be centred around commissioning the Nicklin to Bowman section at or before December 2027 and the successful contractors ability to provide beneficial and successful delay mitigation strategies throughout the execution of the Contract.
Council is seeking to reduce its carbon emissions to Zero Net Energy (ZNE) by 2040. The design has been evaluated utilising the IS Rating Scheme (IS). This is a rating system for evaluating economic, social and environmental performance of infrastructure across the planning, design, construction and operational phases of this infrastructure asset.
An information session will be held onsite on 19 March 2026 at 10am. Respondents are encouraged to attend the information session to familiarise themselves with the site, project requirements, opportunities and constraints.
Works Packaging and Separable Portions:
It is Council’s intent to award a contract to a single contractor. Separable Portions & Works Packages have been allocated for the purpose of managing Council’s funding and assets ownership requirements, budget and schedule risks, and to assign relevant constraint and milestone requirements.
Attachments to this Request
Documents
85
Supplier lists selected
Lists
Building Trade, Repairs, Maint.
Construction & Operation
ELEC, Lighting, Equip & Services
Categories selected
Categories
Building Trade & Repairs & Maintenance Services
1: Landscaping
2: Underground Services Location
Construction & Operation
1: Drainage Services
2: Other Civil Construction Materials & Services
3: Road Building Products & Maintenance & Services
Electrical Systems, Lighting, Equipment & Services
1: Electrical Services
2: Lighting & Light Poles
Regions of Service
Locations
Queensland
1: Sunshine Coast
All Regions of Service locations are within Australia.
Information requested by others
04/Mar/2026 10:45 AM
Question
:
Good Morning,
We confirm that the link to the Project Drawings - Package A is not working and may be corrupt. Please review and advise.
Many thanks.
Answered on 04/Mar/2026 02:24 PM
:
Good afternoon.
Council have tested both links to Project Drawings Package A and B within the Invitation to Tender and confirm these links are working. Please allow a few minutes for the page to load and the download to begin. Please submit another enquiry if you are continuing to experience issues.
04/Mar/2026 04:12 PM
Question
:
We continue to get a timeout error message (error code 524) at our end. We further confirm that we have had 4 work stations/computer attempts to download and we all get this message. We have been able to download Package B just not Package A.
Answered on 10/Mar/2026 11:36 AM
:
Council have provided further links to access Package A (and B) in NTR1 uploaded 10 March 26. Please allow a few minutes for the document to load after clicking the link. If you continue to have issues please send another enquiry in VendorPanel.
05/Mar/2026 02:42 PM
Question
:
We also cannot access the Project Drawings for Package A. We keep getting the error message - This site can’t be reached. The web page at https://publicdocs.scc.qld.gov.au/hpecmwebdrawer/Record/28182193/File/document might be temporarily down or it may have moved permanently to a new web address.
ERR_INVALID_RESPONSE
Answered on 10/Mar/2026 11:35 AM
:
Council have provided further links to access these document packages in NTR1 uploaded 10 March 26. Please allow a few minutes for the document to load after clicking the link. If you continue to have issues please send another enquiry in VendorPanel.
Updates made to this Request
10/Mar/2026 11:29 AM
Please note: The following addendum has been recently added.
1. Added: (Addendum) ITT242 Notice to Respondents 1.pdf
Please consider this addendum when responding.
11/Mar/2026 03:38 PM
Please note: The following addendum has been recently added.
1. Added: (Addendum) ITT242 Notice to Respondents 2.pdf
Please consider this addendum when responding.
17/Mar/2026 10:00 AM
Please note: The following addendum has been recently added.
1. Added: (Addendum) ITT242 Notice to Respondents Three.pdf
Please consider this addendum when responding.
19/Mar/2026 10:12 AM
Please note: The following addendum has been recently added.
1. Added: (Addendum) ITT242 Notice to Respondents Four.pdf
Please consider this addendum when responding.
31/Mar/2026 08:41 AM
Please note: The following addenda have been recently added.
1. Added: (Addendum) ITT242 Meeting Minutes of Information Session.pdf
2. Added: (Addendum) ITT242 Notice to Respondents Five.pdf
Please consider these addenda when responding.
09/Apr/2026 12:21 PM
Please note: The following addenda have been recently added.
1. Added: (Addendum) ITT242 Additional Attachment - Flood Mapping.pdf
2. Added: (Addendum) ITT242 Additional Attachment - Drawing DRG-GD-05.PDF
3. Added: (Addendum) ITT242 Additional Attachment - Traffic Count Data.PDF
4. Added: (Addendum) ITT242 Additional Attachment PUP Survey.ZIP
5. Added: (Addendum) ITT242 Additional Attachments PKGB-TRS-MOD.ZIP
6. Added: (Addendum) ITT242 Additional Attachments Drainage Package A.ZIP
7. Added: (Addendum) ITT242 Additional Attachments Drainage Package B.ZIP
8. Added: (Addendum) ITT242 Additional Attachments Drainage Package C.ZIP
9. Added: (Addendum) ITT242 Additional Attachments Sewer.ZIP
10. Added: (Addendum) ITT242 Additional Attachments Water.ZIP
11. Added: (Addendum) ITT242 Notice to Respondents Six.pdf
Please consider these addenda when responding.
13/Apr/2026 01:00 PM
Please note: The following addendum has been recently added.
1. Added: (Addendum) ITT242 Notice to Respondents Seven.pdf
Please consider this addendum when responding.
15/Apr/2026 04:47 PM
Please note: The following addenda have been recently added.
1. Added: (Addendum) ITT242 Additional Attachment - DWG Pavement Package A & B.DWG
2. Added: (Addendum) ITT242 Notice to Respondents Eight.pdf
Please consider these addenda when responding.
29/Apr/2026 04:19 PM
Please note: The following addenda have been recently added.
1. Added: (Addendum) ITT242 Drawing D08455-10FP-LTG-PLN_2.PDF
2. Added: (Addendum) ITT242 Notice to Respondents Nine.pdf
3. Added: (Addendum) ITT242 Additional Attachment - Review of Environmental Factors Report.pdf
Please consider these addenda when responding.
30/Apr/2026 10:36 AM
Please note: The following addenda have been recently added.
1. Added: (Addendum) ITT242 Additional Attachment - ACM Stormwater Pipes Supplementary Specification.PDF
2. Added: (Addendum) ITT242 Additional Attachment - Relocate OH132KV Feeder marked up drawing.PDF
3. Added: (Addendum) ITT242 Additional Attachments - Energex 11kV Third Avenue.ZIP
4. Added: (Addendum) ITT242 Notice to Respondents Ten.pdf
Please consider these addenda when responding.
06/May/2026 04:22 PM
Please note: The following addenda have been recently added.
1. Added: (Addendum) ITT242 Additional Document - Schedule 5 -Additional Design Drawings.ZIP
2. Added: (Addendum) ITT242 Notice to Respondents Eleven.pdf
3. Added: (Addendum) ITT242 Schedule 6 Appendix 1 Tender Response Form - Addendum A.DOCX
Please consider these addenda when responding.
14/May/2026 11:52 AM
Please note: The following addenda have been recently added.
1. Added: (Addendum) ITT242 Notice to Respondents Twelve.pdf
2. Added: (Addendum) ITT242 REVISED Schedule 4 - General Terms and Conditions - Major Works (Rev1).pdf
Please consider these addenda when responding.
18/May/2026 09:34 AM
Please note: The following addendum has been recently added.
1. Added: (Addendum) ITT242 Notice to Respondents Thirteen.pdf
Please consider this addendum when responding.
19/May/2026 07:58 AM
Please note: The following addendum has been recently added.
1. Added: (Addendum) ITT242 Notice to Respondents Fourteen.pdf
Please consider this addendum when responding.
26/May/2026 04:21 PM
Please note: The following addendum has been recently added.
1. Added: (Addendum) ITT242 Notice to Respondents Fifteen.pdf
Please consider this addendum when responding.
29/May/2026 06:05 PM
Please note: The following addenda have been recently added.
1. Added: (Addendum) ITT242 Notice to Respondents Sixteen.pdf
2. Added: (Addendum) ITT242 Revised Schedule 6 - Appendix 2 - Schedule of Rates - Revision 1.XLSX
The Closing Date has also been extended to 8 June 2026 at 10.00am.
Please consider these addenda when responding.