Tender Details
Access this Tender
Landfill Gas Capture and Flaring System
Business Name
Livingstone Shire Council
VP Reference #
VP523068
Buyers Reference #
2026.900
Opens
Thursday 27 August 2026
(E. Australia Standard Time)
Closes
Monday 12 October 2026 02:00 PM
(E. Australia Standard Time)
Supplier query cut-off
Monday 05 October 2026 02:00 PM
(E. Australia Standard Time)
Expected decision
Friday 11 December 2026
(E. Australia Standard Time)
Buyer Details
Business Name
Livingstone Shire Council
Location
Community Development & Support Office, 40 James St
Yeppoon, Queensland 4703
Australia
WebSite:
https://www.livingstone.qld.gov.au/
Business Info
Business of local government in the Livingstone Shire in Central Queensland
Contact Details
The buyer has elected to have their personal and contact details hidden. These details will be revealed at the buyers discretion.
What the buyer is requesting
Details
Livingstone Shire Council is seeking proposals from suitably qualified and experienced organisations to provide a commercial solution for the financing, design, approval, construction, commissioning, operation and maintenance of a Landfill Gas (LFG) Capture and Flaring System at the Yeppoon Landfill. The proposed solution must safely capture and control landfill gas, provide reliable flaring infrastructure, meet applicable environmental and regulatory requirements, and accommodate potential future landfill gas-to-energy or cogeneration opportunities.
Council is seeking a commercial partnership model under which the successful Respondent will be responsible for the delivery and ongoing operation of the system, including all labour, plant, equipment, approvals, monitoring, reporting, maintenance and associated services necessary to achieve the required performance outcomes. Respondents may also propose innovative approaches that improve environmental, operational or commercial outcomes for Council.
Location of Services
The works and services will be undertaken at Yeppoon Landfill, Livingstone Shire, Queensland. Site inspections will be available during the procurement process. While some design, engineering, monitoring and reporting activities may be undertaken remotely, the successful Respondent must be capable of delivering and supporting on-site operations, maintenance and incident response services throughout the contract term.
Expected Timing
Council's anticipated procurement timetable is:
RFP issued: 27 August 2026
Optional site inspection: 16 September 2026
Questions close: 28 September 2026
RFP closes: 5 October 2026
Key Outcomes Sought
- Capture and control landfill gas in accordance with environmental, safety and regulatory requirements.
- Reliably flare landfill gas to achieve methane destruction and odour control.
- Establish infrastructure capable of supporting future landfill gas-to-energy, cogeneration or other beneficial gas utilisation opportunities.
- Deliver measurable and ongoing commercial returns to Council through a revenue-sharing arrangement.
- Maintain safe, compliant and continuous operation of the landfill gas capture and flaring system throughout the contract term
This Request for Proposal seeks responses from organisations with demonstrated experience in landfill gas capture, landfill gas flaring, landfill gas-to-energy projects and related environmental infrastructure services. Council welcomes innovative and commercially sustainable solutions that support environmental compliance, risk management and long-term value for the community.
Attachments to this Request
Documents
14
Supplier lists selected
Lists
Mining & Quarrying & Oil & Gas
Categories selected
Categories
Mining & Quarrying & Oil & Gas
1: Landfill Gas Management Services
Regions of Service
Locations
Queensland
1: Fitzroy
All Regions of Service locations are within Australia.
Information requested by others
28/Aug/2026 09:59 AM
Question
:
Good morning,
Is Council able to provide the volume and composition data of the waste landfilled at the site for the past 5 years or longer if possible?
Does Council have survey data of the total volume of waste landfilled at the site ?
Does Council have survey data on the depth of the waste in place?
Does Council have as constructed drawings of the waste cells ?
Is 3 phase power available at the site?
Answered on 08/Sep/2026 11:01 AM
:
Thank you for your questions.
Council has issued Addendum No. 1 containing responses to Tenderer queries and supporting documentation.
Tenderers should refer to Addendum No. 1 and its attachments when preparing their Tender submission.
01/Sep/2026 01:50 PM
Question
:
Hi
We note that the closing date is 5 October 2026 which is listed in Queensland as a public holiday. Would it be possible to extend the closing date for a few days?
Answered on 02/Sep/2026 12:20 PM
:
Thank you for raising this.
While 5 October 2026 falls on a Queensland public holiday, the tender will have been available to the market for 38 days by the advertised closing date, substantially exceeding the minimum public tender advertising period. Suppliers therefore have sufficient time and opportunity to prepare and lodge submissions, including prior to the public holiday should they not wish to rely on submitting on the advertised closing date.
Accordingly, Council considers the current closing date appropriate and is comfortable maintaining the advertised timeframe.
03/Sep/2026 12:33 PM
Question
:
Hi Barry,
To assist us in the preparation of our proposal can you please provide some clarification and any information regarding the following:
1. When did the Yeppoon Landfill commence operations and begin accepting waste?
2. When is the landfill expecting to cease accepting waste?
3. What are the quantities of waste deposited to landfill? Please provide a yearly breakdown if possible.
4. Please provide breakdown of waste types received - Municipal Solid Waste (MSW), Commercial & Industrial (C&I), Construction & Demolition (C&D)
5. Please provide any available gas modelling.
6. Does the site have any current Gas Collection System (GCS) infrastructure?
7. If a GCS exists, please provide the current GCS layout including perimeter bores as a .dwg / .dxf file.
8. Please provide well balancing data from the past 6 months if available.
9. Please provide the current well installation logs if available.
10. Please provide base liner as-constructed details in dxf or dwg files.
11. Please provide Top of Cap (TOC) as-constructed details as dxf or dwg files.
12. Please provide base liner and Top of Cap construction details.
13. Does the Council have a preference for infrastructure to be trenched into the cap or be surface laid?
14. Can drilling waste be disposed of at the landfill free of charge?
15. Please provide a copy of the current landfill licence.
We appreciate the Councils assistance in providing this information.
Answered on 08/Sep/2026 11:02 AM
:
Thank you for your questions.
Council has issued Addendum No. 1 containing responses to Tenderer queries and supporting documentation.
Tenderers should refer to Addendum No. 1 and its attachments when preparing their Tender submission.
09/Sep/2026 11:20 PM
Question
:
XOil Petroleum greatly appreciates if the Livingstone Shire Council provides answer to below queries regarding VP reference Number : VP523068 please:
1. Landfill Gas Data & Site Conditions
The RFP states that “landfill gas generation data and historical landfill gas assessments are not available” (Technical Specification, p. 12).
Clarification Questions:
1. Can Council provide any previous environmental monitoring reports, even if limited, that may indicate methane trends or historical gas behavior?
2. Are there any recent waste acceptance records, filling rates, or cell development plans that would help inform gas generation modelling?
3. Can Council confirm whether any previous gas wells, passive vents, or trial flaring systems exist on site?
4. Will Council provide topographical surveys, cap thickness information, or geotechnical data for drilling and well installation planning?
2. Landfill Operational Interface
The Technical Specification requires the Contractor to support ongoing landfill operations.
Clarification Questions:
5. Can Council provide a current landfill operations plan, including active tipping areas, future cell development timelines, and rehabilitation schedules?
6. What are the site access constraints, including operating hours, traffic management, and heavy vehicle movement restrictions?
7. Will Council provide laydown areas for materials, flare compound construction, and temporary works?
8. Are there any noise, dust, or odour management restrictions that may affect drilling or flare installation?
3. Approvals & Regulatory Requirements
The Contractor is responsible for obtaining all approvals (Technical Specification •2.2).
Clarification Questions:
9. Can Council confirm whether the existing Environmental Authority (EA) already includes landfill gas capture and flaring activities, or whether an EA amendment will be required?
10. Will Council assist with local government planning approvals, or is the Contractor expected to manage all submissions independently?
11. Are there any heritage, cultural, or ecological constraints applicable to the flare compound location?
4. Future Cogeneration Requirements
The Technical Specification requires provision for future gas to energy development.
Clarification Questions:
12. Does Council have a preferred cogeneration technology (e.g., reciprocating engine, microturbine)?
13. Has Council engaged with local Energy authorities regarding potential grid connection feasibility or constraints?
14. Does Council expect the Contractor to include preliminary cogeneration feasibility modelling in the initial proposal?
5. Performance Requirements & Reporting
The RFP requires continuous operation and detailed monitoring (Technical Specification •5).
Clarification Questions:
15. Can Council confirm what must be the required methane destruction efficiency (e.g., 98%, 99%)?
16. Does Council require real time SCADA access, or is periodic data export sufficient?
17. Are there any specific KPIs Council intends to include in the contract (uptime %, response times, maintenance compliance)?
7. Risk Allocation & Contractual Matters
The RFP states Council may negotiate with any proponent (Section 9.2).
Clarification Questions:
18. Will Council provide a draft contract before submission, or only after evaluation?
19. Can Council clarify the risk allocation for:
• Force majeure events
• Landfill operational changes
• Gas generation variability
• Regulatory changes
20. Does Council require performance bonds, parent company guarantees, or other financial securities?
21. y guarantees, or other financial securities?
Answered on 17/Sep/2026 12:50 PM
:
Question 1
Can Council provide any previous environmental monitoring reports, even if limited, that may indicate methane trends or historical gas behaviour?
Response
Council undertakes quarterly landfill gas monitoring using perimeter monitoring bores located outside the landfill footprint. Monitoring to date has not identified evidence of landfill gas migration beyond the landfill boundary.
Question 2
Are there any recent waste acceptance records, filling rates, or cell development plans that would help inform gas generation modelling?
Response
Waste disposal data for the previous five financial years has been provided in Attachment 1 to Addendum No. 1. Based on current operational assumptions and airspace consumption forecasts, Council estimates that the current operating landfill cell (Cell 2B) has approximately three years of remaining capacity before final capping. Construction of Cell 3A is currently underway and will provide the next stage of landfill development. No additional landfill gas generation modelling information is available.
Question 3
Can Council confirm whether any previous gas wells, passive vents, or trial flaring systems exist on site?
Response
Council confirms that no landfill gas wells, passive gas vents or trial flaring systems currently exist, or are known to have previously existed, at the site.
Landfill Operational Interface
Question 4
Will Council provide topographical surveys, cap thickness information, or geotechnical data for drilling and well installation planning?
Response
Available cell construction information and topographical survey data will be made available to the preferred tenderer.
Question 5
Can Council provide a current landfill operations plan, including active tipping areas, future cell development timelines, and rehabilitation schedules?
Response
A recent aerial photograph of the landfill site showing the current landfill operational area, active cell locations and future landfill development areas has been provided as Attachment 6 - Aerial Photograph of Current Landfill Site Operations. Council estimates that the current operating landfill cell (Cell 2B) has approximately three years of remaining capacity before final capping. Construction of Cell 3A is currently underway and will provide the next stage of landfill development. No additional landfill operations plans or rehabilitation schedules will be provided as part of this procurement process.
Question 6
What are the site access constraints, including operating hours, traffic management requirements and heavy vehicle movement restrictions?
Response
The landfill operates from 7:00 am to 5:00 pm daily, excluding Christmas Day and Good Friday.
Council is not currently aware of any site-specific traffic management or heavy vehicle movement restrictions that would be expected to materially affect the proposed works. All vehicles entering and leaving the site are required to pass through the weighbridge in accordance with normal landfill operating procedures.
Question 7
Will Council provide laydown areas for materials, flare compound construction and temporary works?
Response
Yes. Council will make suitable areas available for laydown, flare compound construction and temporary works associated with the delivery of the project. The location and extent of such areas will be agreed with the successful contractor.
Question 8
Are there any noise, dust or odour management requirements that may affect drilling or flare installation activities?
Response
The contractor will be required to undertake all works in accordance with applicable legislative requirements and the site's Environmental Authority, including requirements relating to dust and odour management.
The current Environmental Authority is available through the Queensland Government Environmental Authority Register (Environmental Authority No. EPPR01823814).
Approvals and Regulatory Requirements
Question 9
Can Council confirm whether the existing Environmental Authority includes landfill gas capture and flaring activities, or whether an amendment to the Environmental Authority will be required?
Response
Council is currently considering the approval pathway that may be required to support landfill gas capture and flaring activities. Tenderers should make their own enquiries regarding any approvals relevant to their proposed solution.
The current Environmental Authority (EPPR01823814) was referenced in Addendum No. 1 and is publicly available through the Queensland Government Environmental Authority Register. Tenderers should make their own enquiries regarding approval requirements relevant to their proposed solution.
Question 10
Will Council assist with local government planning approvals, or is the contractor expected to manage all submissions independently?
Response
Council will provide reasonable assistance throughout approval processes where required. However, approval applications and supporting documentation will need to be prepared and submitted through the applicable statutory processes.
Question 11
Are there any heritage, cultural or ecological constraints applicable to the proposed flare compound location?
Response
Council has not identified any known heritage, cultural or ecological constraints affecting the proposed flare compound location. However, tenderers remain responsible for satisfying themselves as to site conditions and constraints relevant to their proposed solution.
Tenderers remain responsible for undertaking their own investigations and satisfying themselves as to site conditions and constraints relevant to their proposed solution.
Future Gas-to-Energy Requirements
Question 12
Does Council have a preferred cogeneration technology (for example, reciprocating engine or microturbine)?
Response
No. Council does not have a preferred cogeneration technology.
Question 13
Has Council engaged with energy authorities regarding potential grid connection feasibility or constraints?
Response
No. Council has not undertaken discussions regarding grid connection feasibility or associated network constraints.
Question 14
Does Council expect tenderers to include preliminary gas-to-energy feasibility modelling within their proposal?
Response
No. Preliminary gas-to-energy feasibility modelling is not required as part of the proposal submission.
Performance Requirements and Reporting
Question 15
Can Council confirm the required methane destruction efficiency?
Response
Tenderers should nominate the methane destruction efficiency associated with their proposed solution and provide supporting information within their proposal.
Question 16
Does Council require real-time SCADA access, or will periodic data reporting be sufficient?
Response
Council does not require real-time SCADA access. Periodic reporting and data export functionality will be sufficient.
Question 17
Are there any specific KPIs Council intends to include in the contract?
Response
Performance measures and key performance indicators will be negotiated with the successful tenderer as part of contract finalisation.
Risk Allocation and Contractual Matters
Question 18
Will Council provide a draft contract before submission, or only after evaluation?
Response
Council intends to work collaboratively with shortlisted tenderers during the evaluation phase to negotiate and develop mutually acceptable contractual arrangements.
Question 19
Can Council clarify the proposed allocation of risk relating to force majeure events, landfill operational changes, gas generation variability and regulatory changes?
Response
Risk allocation and associated contractual mechanisms will form part of contract discussions and negotiations with shortlisted tenderers during the evaluation phase.
Question 20
Does Council require performance bonds, parent company guarantees or other financial securities?
Response
Financial security requirements, if applicable, will be determined having regard to the proposed solution, project delivery methodology and risk profile, and will be discussed with shortlisted tenderers during the evaluation phase.
14/Sep/2026 09:53 AM
Question
:
Where do we find the forum to register for the site inspection?
Answered on 14/Sep/2026 11:39 AM
:
Council reminds all interested participants that registration for the site visit must be submitted via the Questions for Tender section in VendorPanel.
The site visit will be held at Yeppoon Landfill, 2745 Yeppoon Road, Barmaryee QLD 4703, on Wednesday, 16 September 2026 at 10:00 am. Participants are to meet in the car parking area at the entrance.
Participants wishing to attend must lodge their registration through VendorPanel by Monday, 14 September 2026, including the names, organisation and contact details of proposed attendees.
Updates made to this Request
08/Sep/2026 11:12 AM
Please note: The following addenda have been recently added.
1. Added: (Addendum) 2026.900 - Landfill Gas Capture - Addendum No 1 8 September 2026.docx
2. Added: (Addendum) Attachment 1 - Waste Disposal Data.docx
3. Added: (Addendum) Attachment 2 - Landfill Design and As-Constructed Drawings.zip
4. Added: (Addendum) 1 of Attachment 3 - Base Liner Design & As-Constructed Documentation.pdf
5. Added: (Addendum) 2 of Attachment 3 - Base Liner Design & As-Constructed Documentation.pdf
6. Added: (Addendum) Attachment 4 - Top of Cap Design Documentation.dwg
7. Added: (Addendum) Attachment 5 - Additional Landfill Engineering Drawings and Supporting Documentation.zip
Please consider these addenda when responding.
08/Sep/2026 11:40 AM
Please note: The following addenda have been recently added.
1. Added: (Addendum) 2026.900 - Landfill Gas Capture - Addendum No 1 - 8 September 2026.pdf
2. Added: (Addendum) Attachment 1 - Waste Disposal Data.pdf
3. Added: (Addendum) 1 of Attachment 3 - Base Liner Design & As-Constructed Documentation.pdf
4. Added: (Addendum) 2 of Attachment 3 - Base Liner Design & As-Constructed Documentation.pdf
5. Added: (Addendum) Attachment 2 - Landfill Design and As-Constructed Drawings.zip
6. Added: (Addendum) Attachment 4 - Top of Cap Design Documentation.dwg
7. Added: (Addendum) Attachment 5 - Additional Landfill Engineering Drawings and Supporting Documentation.zip
Please consider these addenda when responding.
17/Sep/2026 12:53 PM
Please note: The following attachment in relation to question 5 has been recently added.
1. Added: Attachment 6 - Aerial Photograph of Current Landfill Site Operations.png
The attachment is provided for information purposes only.
22/Sep/2026 12:44 PM
Please note: The following addenda have been recently added.
1. Added: (Addendum) 2026.900 - Landfill Gas Capture - Addendum No 2.docx
2. Added: (Addendum) Attachment 1 - Yeppoon Landfill Development Stage 2B - Design and Construction Drawings.pdf.pdf
3. Added: (Addendum) Attachment 2 – Yeppoon Landfill Leachate & Stormwater Management – Cell 2B Drawings.pdf.pdf
4. Added: (Addendum) Attachment 3 - Yeppoon Landfill Periodic Audit Survey and Remaining Airspace Volume - May 2026.pdf.pdf
Please consider these addenda when responding.
25/Sep/2026 03:47 PM
Tender Closing Date Extended
Please be advised that the closing date for this tender has been extended to Monday, 12 October 2026 at 2:00 PM.
All other tender requirements remain unchanged. Thank you.