Tender Details
001300_Cairns Masterplan
Business Name
James Cook University
VP Reference #
VP511103
Buyers Reference #
001300
Opens
Tuesday 26 May 2026 (E. Australia Standard Time)
Closes
Thursday 11 June 2026 03:00 PM (E. Australia Standard Time) CLOSED
Supplier query cut-off
Monday 08 June 2026 03:00 PM (E. Australia Standard Time)
Expected decision
Thursday 02 July 2026 (E. Australia Standard Time)
Buyer Details
Business Name
James Cook University
Location
James Cook Dr
Douglas, Queensland 4814
Australia
WebSite:
https://www.jcu.edu.au/
Business Info
James Cook University
Contact Details
The buyer has elected to have their personal and contact details hidden. These details will be revealed at the buyers discretion.
What the buyer is requesting
Details
Suppliers are invited by James Cook University (JCU) to submit an offer for the Cairns Masterplan for the provision of Principal Consultant Services whereby it is anticipated that the Principal Consultant will be responsible for engaging the subconsultants deemed necessary to complete all tasks / deliverables required, in-line with the Scope of Works.
Background information / Compatibility requirements
Details
JCU Cairns has two locations: Nguma-bada, Smithfield; and The Yeinie Building, which is part of the Dugurrdja Precinct. In addition, JCU leases shared facilities within the Cairns Hospital to support clinical training and education. Collectively these locations form a connected and supportive learning environment, with 2419 students enrolled in 2026. Across these locations, the University provides a diverse range of facilities, including teaching and research spaces, informal study areas, library services, food and retail offerings, sporting facilities, and a variety of student-led clubs and activities. This distributed campus model supports a strong sense of community while enabling access to specialised learning environments aligned with academic and industry needs.
Desired Outcomes ('Nice to haves', Conditions & Warranties, SLA's, Project benefits)
Details
Tender Open: 26 May 2026

Tender Close: 11 June 2026

Expected Contract Start: 1 July 2026

(Start date is indicative and subject to change).
Supplier lists selected
Lists
  • Architecture, Design, Planning
  • Engineer, Research, Tech services
Categories selected
Categories
  • Architecture & Urban Design & Planning Services
    1: Architecture
    2: Land Use Planning
    3: Landscape Architecture
    4: Urban Design & Master Planning
  • Engineering & Research & Technical Based Services
    1: Engineering Consulting Services
    2: Project Management
Regions of Service
Locations
  • Queensland
    1: Far North

All Regions of Service locations are within Australia.
Information requested by others
02/Jun/2026 07:56 AM
Question:
We kindly seek clarification in the below areas. Many thanks in advance.

1. Please confirm whether tenderers are required to nominate all subconsultants and their fees at tender submission, or whether some specialist subconsultants may be nominated and priced later once the building needs, asset condition and priority project list are confirmed.

2. Please confirm the definitive list of buildings, floors, spaces and external campus areas to be assessed, including whether the assessment includes all operational buildings at Nguma-bada Smithfield, The Yeinie Building, Dugurrdja Precinct areas, Cairns Hospital leased/shared spaces, student accommodation, sports facilities, retail, food and support spaces.

3. Please confirm the anticipated building area for the commission, including current GFA/NLA/UFA to be assessed, the target area for future growth and whether the 2019 Cairns Master Plan figures of up to 63,000m² new GFA and 130,000m² total GFA within the University Centre Zone remain current planning references.

4. Please confirm whether assessment of structural integrity, asset lifespan, services capacity, fire compliance, accessibility, hazardous materials, asbestos, civil infrastructure, flooding, traffic, parking and building code compliance is required as part of the base scope.

5. Please confirm the required number and level of detail for “concept plans”. Are concept plans required for every building and floor, every identified opportunity, or only for agreed priority projects?

6. Please confirm the required level of QS input, including the number of projects or options requiring cost estimates and whether JCU expects order-of-magnitude estimates, elemental cost plans, lifecycle cost commentary, escalation, contingency, decanting, enabling works and infrastructure allowances.

7. Please confirm whether JCU will lead engagement with Traditional Owners and First Nations stakeholders, and provide the current Indigenous Design Principles and engagement protocols at commencement.

8. Please confirm whether transport, parking, pedestrian, cycling, wayfinding and campus arrival analysis is required at strategic framework level only, or whether traffic engineering, parking modelling, authority consultation and detailed wayfinding strategy are expected.

9. Please confirm whether sustainability and resilience outputs are to be strategic principles and project prioritisation criteria, or whether JCU requires quantified carbon, energy, water, climate, microclimate, lifecycle or net zero modelling.

10. Please confirm whether the successful consultant is expected to update, supersede, validate or simply build upon the Cairns Campus Master Plan 2019 and Dugurrdja Precinct Master Plan 2023.

11. Please confirm whether JCU requires a conforming lump sum only, or whether tenderers may submit optional separable prices for additional workshops, detailed technical due diligence, expanded QS, advanced digital outputs, additional presentations and detailed concept design.

12. Please confirm whether evaluation of local content is based on the Principal Consultant’s office location, the whole consultant team, proposed local workshare, or demonstrated local/regional benefit.

Answered on 08/Jun/2026 02:51 PM:


Good afternoon,

Apologies for the delay getting the responses to you. Please note that the responses to your questions will be uploaded as an attachment to this tender shortly (Named: 001300_RFI 001).

Thank you,

Hayley.
02/Jun/2026 01:44 PM
Question:
Can you please provide the JCU Cairns Masterplan 2019 Appendices including:

A - Previous Studies

B- Campus Comparison Analysis

C - Consultation Outcomes

D - Campus Context Planning

E - Computational Fluid Dynamics & Microclimate Report

F - Infrastructure Analysis

G - Town Planning Report

H - Ministerial Designation Letter

I - Secondary School Sitting Study

J - Campus Context Mapping Analysis

Answered on 08/Jun/2026 02:52 PM:


Good afternoon,

Unfortunately these attachments are not accessible at this time.

Thank you,

Hayley.
03/Jun/2026 11:09 AM
Question:
Under Section 2 of Schedule 2 - Scope of Works, JCU are seeking to engage a Principal Consultant. Are you able to clarify whether the intention is for this to be a Project Manager or Architecturally led Principal Consultant engagement?

Answered on 08/Jun/2026 02:54 PM:


Good afternoon,

The intent is that the Contractor awarded the Cairns Masterplan project will be engaged as the Principal Consultant for this project.

Thank you,

Hayley.
Updates made to this Request
08/Jun/2026 03:02 PM
Please note: The following attachment has been recently added.

1. Added: 001300_RFI 001.pdf

Please consider this attachment when responding.

08/Jun/2026 03:03 PM
Good afternoon,

Please note that in the Scope of Works, Item 5 - the Final Deliverable date is amended to be: 26 February 2027.

Thank you,

Hayley.