Tender Details
Access this Tender
Rosny Creative Precinct - Architect and Design Services Consultancy
Business Name
City of Clarence
VP Reference #
VP524180
Buyers Reference #
T1658-26
Opens
Saturday 05 September 2026
(Tasmania Standard Time)
Closes
Wednesday 07 October 2026 03:00 PM
(Tasmania Standard Time)
Supplier query cut-off
Wednesday 23 September 2026 02:00 PM
(Tasmania Standard Time)
Expected decision
Wednesday 18 November 2026
(Tasmania Standard Time)
Buyer Details
Business Name
City of Clarence
Location
38 Bligh St
Rosny Park, Tasmania 7018
Australia
WebSite:
https://www.ccc.tas.gov.au/
Business Info
Clarence City Council (or City of Clarence) is a local government body in Tasmania, and one of the five municipalities that constitutes the Greater Hobart Area. The Clarence local government area has a population of 56,945, covering the eastern shore of the Derwent River from Otago to the South Arm Peninsula and the smaller localities of Cambridge, Richmond, and Seven Mile Beach.
The administrative centre and main commercial district of Clarence is Rosny Park, approximately 5 kilometres from the CBD of Hobart. Bellerive Oval lies immediately to the south, and the Hobart International Airport is located further north-west along the Tasman Highway.
Contact Details
The buyer has elected to have their personal and contact details hidden. These details will be revealed at the buyers discretion.
What the buyer is requesting
Details
Rosny Creative Precinct – Architect and Design Services Consultancy
T1658-26
Tenders are invited from suitably qualified Contractors for the above.
Tender responses are to be submitted electronically via Council’s Vendor Panel portal, or via email to tenders@ccc.tas.gov.au and with the description and tender number (T1658-26) clearly marked, until 3.00pm AEDT on 7 October 2026.
Tender documents will be available by downloading from Vendor Panel www.vendorpanel.com.au/clarencecity/tenders or by contacting Procurement on (03) 6217 9500 or procurement@ccc.tas.gov.au
Neither the lowest nor any tender will necessarily be accepted. Late tenders will not be considered.
For further information, please contact Procurement on (03) 6217 9500 or procurement@ccc.tas.gov.au
Attachments to this Request
Documents
2
Supplier lists selected
Lists
Architecture, Design, Planning
Categories selected
Categories
Architecture & Urban Design & Planning Services
1: Architecture
Regions of Service
Locations
Tasmania
1: Southern
All Regions of Service locations are within Australia.
Information requested by others
08/Sep/2026 11:20 AM
Question
:
Hi,
I notice the RFT documents suggest Council is going to be appointing separate consultants for Traffic and Transport Services. Are you able to please advise if this will be coming out as an open tender and is there an indicative timeframe for release of this RFT?
Kind regards,
Answered on 14/Sep/2026 12:04 PM
:
Good Afternoon,
Council will be appointing a separate consultant for Traffic and Transport Services. Council will coordinate these Services with the Architect and Design Services consultancy as required. It is unlikely that the Traffic and Transport Services procurement will be released prior to the closing date for this tender.
08/Sep/2026 02:57 PM
Question
:
Hello, are you able to clarify the questions below:
- What is the extent of Creative Precinct Area to be Masterplanned? Can a plan be provided for clarity? (Is this defined by the extent of the City Heart Plan or only a portion of this area?)
- Can Schedule 5 be reformatted to suit company style guide?
- Do we include consultant hourly rates in Criteria 4 table
- Are 'injuries' questions in Criteria 2C relevant to Architectural consultancy?
- Council is to direct-appoint Cultural Advisors - Does this include Aboriginal Heritage Assessment? Planning for County Framework?
- Council is to direct-appoint Comms & Engagement - Does this include Stakeholder Engagement?
Answered on 14/Sep/2026 12:06 PM
:
Good Afternoon,
1.
The current project area is based on the broader title boundary that incorporates Rosny Farm and the surrounding parklands. A plan can be provided for clarity. The extent of the Master Plan area will be tested and confirmed through the master planning process, including consideration of relevant connections to the surrounding Rosny Parklands and broader City Heart area.
2.
The part 5 can be amended to suit a company’s style guide however, it is imperative the guide contains all parts of Councils part 5. Any sections missing may impact scoring and conformity of the submission.
3.
yes, please include hourly rates for sub-consultants
4.
yes, it relates to any injury (physical or otherwise) that lead to any loss of time on the project.
5.
Councils directly appointed Cultural Advisor will provide cultural advice and support the Design on Country process. This does not include Aboriginal heritage assessment or statutory heritage advice, which should be allowed for within the Consultant’s Heritage services where required. The Cultural Advisor will work with the Consultant team to inform the Planning for Country framework and its application to the project.
6.
Council’s directly appointed Comms and Engagement consultant will support the broader stakeholder and community engagement process. The Architect and Design Services Consultant will still be required to participate in stakeholder engagement relevant to the Master Plan, prepare design materials for engagement, and facilitate design-focused workshops and activities where agreed with Council.
09/Sep/2026 11:45 AM
Question
:
Can Clarence City Council please clarify whether the architectural team is required to appoint a Project Manager as per Requirement 2.2?
Answered on 14/Sep/2026 12:07 PM
:
Good Afternoon,
The requirement of 2.2 is for the consultant to name up the suggested team for this project. It may be that the title held by staff is not ‘Project Manager’ but some other like title. You will be required to name up the Manager of the Architecture and Design Services Consultancy.
The Project Manager for the Rosny Creative Precinct will be engaged under a separate (recently closed) RFQ.
11/Sep/2026 09:44 AM
Question
:
Could Council please provide more definition around functional brief?
Does Council have a defined budget for the masterplanning phase?
Answered on 14/Sep/2026 12:08 PM
:
Good Afternoon,
1.
The Functional Design Brief is intended to establish the design basis for the precinct, translating the project objectives and relevant operational, stakeholder, asset management, maintenance and Business Case requirements into spatial and functional requirements. This may include requirements such as functions and uses, indicative spatial requirements, relationships between uses, operational requirements and other matters necessary to inform precinct planning and design.
2.
Council has an approved budget for the overall funded project. A specific fee budget has not been prescribed for the Architect and Design Services consultancy. Tenderers are requested to propose a fee appropriate to the scope and deliverables set out in the RFT.
17/Sep/2026 04:33 PM
Question
:
The City Heart Plan identifies a range of potential facilities within the Rosny Parklands and Rosny Farm precinct, including a contemporary gallery, workshops/maker spaces, youth facilities, cultural pavilions, performance spaces, event infrastructure and hospitality uses. Please identify which of these facilities Council expects to be investigated and developed to Development Application level as part of this commission.
Answered on 25/Sep/2026 02:53 PM
:
Good Afternoon,
The facilities identified in the City Heart Plan are conceptual and should not be taken as a predetermined facility program for the Rosny Creative Precinct. The appropriate mix of facilities will be investigated and tested through the Business Case, stakeholder engagement and precinct planning and options process.
The RFT identifies potential opportunities including creative production facilities, performance and exhibition spaces, youth-focused facilities and associated public realm and landscape improvements. The requirement to develop the Precinct Master Plan to Development Application level applies to the preferred precinct outcome arising from this process, rather than to individual concepts identified through the City Heart Plan
18/Sep/2026 01:52 PM
Question
:
Are items 7,12,13,14,15 on Page 51 of the City Heart Plan included in the scope for development application?
Answered on 25/Sep/2026 02:53 PM
:
Good Afternoon,
These items identified in the City Heart Plan are conceptual and should not be taken as predetermined inclusions in the Rosny Creative Precinct or as individual items required to be developed to Development Application level. The appropriate mix of facilities and uses will be investigated and tested through the Business Case, stakeholder engagement and precinct planning and options process.
22/Sep/2026 12:53 PM
Question
:
SITE AND PLANNING
1. Can Council confirm the site boundary and titles for the precinct study
area at Rosny Parklands, and whether the study area is fixed or is to be
tested through the options process?
2. What are the current zone and overlays applying to the study area under
the Tasmanian Planning Scheme – Clarence? Does Council anticipate that the
proposed creative production, performance, exhibition and youth-focused
uses are permitted or discretionary in that zone, and does Council expect
a planning scheme amendment to form part of the approvals pathway?
3. Does a Conservation Management Plan exist for Rosny Farm and the Rosny
Barn, and will it be provided to the successful tenderer? Are any parts of
the study area entered on the Tasmanian Heritage Register or Council's
heritage list?
4. Will Council provide existing survey, geotechnical, services,
contamination, arboricultural or building condition data for the study
area, or is that investigation within the Architect and Design Services
scope?
SCOPE BOUNDARY AND FEE
5. Schedule 1 lists Land Surveying, Environmental and Geotechnical among the
disciplines the Consultant must engage. Does Council expect the Consultant
to price physical survey and intrusive site investigation works, or the
coordination of investigations commissioned by Council?
6. Council intends to engage Quantity Surveying, Cultural Advisors, Legal,
Comms and Engagement, and Traffic and Transport directly. Can Council
confirm these are excluded from the Consultant's fee, and that the
Consultant is not responsible for their programme or performance?
7. How many stakeholder and community engagement activities, design workshops
and presentations should tenderers allow for across the five milestones,
and what is the expected split between Council-facilitated and
Consultant-facilitated sessions?
8. What is the expected number and format of design review workshops and
Council presentations at each milestone?
DESIGN ON COUNTRY
9. Has Council appointed the palawa Cultural Advisor, and can Council
describe the Design on Country process, its expected touchpoints against
the five milestones, and how the Consultant is expected to interface with
the Advisor?
10. Does Council expect the Consultant to bring its own First Nations design
partner in addition to Council's appointed Cultural Advisor?
PROJECT STRUCTURE AND CONTRACT
11. Have the External Project Management Consultant and the Business Case
Consultant been appointed, and can Council describe the reporting and
decision interfaces between the three principal consultant workstreams?
12. The hold points at Schedule 1 clause 7 refer to consideration of
"independent assurance advice". Who provides that assurance, and what
turnaround should tenderers allow between submission of a milestone and
release of the hold point? Given the fixed 30 November 2027 end date,
does Council accept that assurance and hold point review durations are
Council-controlled causes for the purposes of the variations clause?
13. Are the Greater Hobart Cultural Venues Study, the Cultural and Creative
Strategy and the City Heart Plan evidence base available to tenderers,
and will Council provide any prior feasibility or business case work
undertaken for the precinct?
14. Schedule 2 notes Council is open to negotiation on payment frequency.
Will Council consider progress payments more frequent than the five
milestones?
Answered on 25/Sep/2026 03:03 PM
:
Good Afternoon,
1
The current study area is based on the title boundary incorporating Rosny Farm and the surrounding parklands.
The study area should be treated as the starting point for the commission rather than a fixed master planning boundary. Its extent will be tested through the evidence base and options process, having regard to the preferred precinct outcome and relevant connections and interfaces with the surrounding Rosny Parklands and broader City Heart area.
2
The applicable zoning, overlays and planning controls are to be confirmed through the Consultant’s Town Planning services as part of the existing conditions and site analysis.
Council has not predetermined the planning pathway or the use classifications that will apply to the preferred precinct outcome. The Consultant is expected to assess the permissibility and approval requirements of proposed uses as the precinct options are developed, and identify whether a planning scheme amendment or other statutory process would be required to facilitate the preferred outcome.
3
A Conservation Management Plan exists for Rosny Farm, including the Rosny Barn, and will be provided to the successful applicant.
The Consultant should confirm the heritage status of the study area, including any places entered on the Tasmanian Heritage Register or Council’s heritage list, as part of its Heritage and existing conditions investigations.
4
Council will provide relevant existing site and technical information in its possession to the successful Consultant. Respondents should not assume that comprehensive or current survey, geotechnical, services, contamination, arboricultural or building condition information is available.
The Consultant is expected to identify and undertake, through its multidisciplinary team, the investigations required to deliver the scope and Precinct Master Plan to the required level of resolution. Where existing information provided by Council is suitable for reliance or use, unnecessary duplication of investigations will not be required.
5
The Consultant should allow for the physical survey and site investigations reasonably required to deliver the scope, including through the Land Surveying, Environmental and Geotechnical disciplines identified in Schedule 1. Council does not intend to separately commission these investigations.
Existing information held by Council will be provided to the successful Consultant and may be relied upon where appropriate, to avoid unnecessary duplication.
6
The Quantity Surveying, Cultural Advisor, Legal, Comms and Engagement, and Traffic and Transport services identified as being directly engaged by Council are excluded from the Consultant’s fee.
Council will be responsible for the appointment and contractual management of these consultants. The Architect and Design Services Consultant will be required to coordinate with them as relevant to its scope, programme and deliverables, and to integrate their advice and inputs into the design and Precinct Master Plan where required.
7
Community engagement will be coordinated by Council, with the Consultant expected to participate and provide design materials and input as required. Stakeholder engagement will be coordinated across the Project Management, Business Case and Architect and Design Services consultancies, with responsibilities determined according to the purpose and subject matter of each engagement.
The Architect and Design Services Consultant should allow for facilitating design-focused workshops and activities relevant to its scope. The detailed engagement programme and allocation of responsibilities will be established during mobilisation and integrated into the overall project programme.
8
Council has not prescribed a fixed number or format of design review workshops or Council presentations at each milestone. Respondents should allow for design review and presentation activities appropriate to each milestone and their proposed methodology.
9
Council has not yet appointed a Palawa Cultural Advisor. The Advisor will be directly engaged by Council and will provide cultural advice and support the Design on Country process.
Design on Country is intended to be integrated throughout the commission rather than undertaken as a standalone activity. Respondents should allow for engagement with the Cultural Advisor at relevant stages of the design process, including development of the strategic and functional design brief, options development and evaluation, development of the preferred option, and preparation and refinement of the Precinct Master Plan.
The Consultant will be expected to work collaboratively with the Cultural Advisor, incorporate relevant cultural advice into the design process and demonstrate how that advice has informed the evolving design response. The detailed process and touchpoints will be established during mobilisation with Council, the Cultural Advisor and the broader project team.
10
No. Council does not require the Consultant to engage a separate First Nations design partner in addition to Council’s appointed Cultural Advisor.
Respondents may choose to include additional First Nations design expertise within their team where this supports their proposed methodology.
11
The External Project Management and Business Case RFQs have closed and the respective procurement processes are currently underway. Neither consultant has yet been appointed.
The three principal consultant workstreams will operate as an integrated project team under Council’s direction.
- The External Project Management Consultant will coordinate overall project delivery, programme and interfaces
- The Business Case Consultant will lead development of the Business Case and associated analysis
- The Architect and Design Services Consultant will lead the multidisciplinary design and Precinct Master Plan workstream.
Council’s Project Lead will provide client-side leadership, integrate the workstreams and manage project governance and key decision-making. The consultants will be expected to work collaboratively, with dependencies and interfaces coordinated through the integrated project programme and governance arrangements.
12
Independent assurance will be arranged by Council and will be undertaken by a suitably qualified independent advisor. The appointment has not yet been made.
Council has not prescribed a fixed turnaround period for assurance and hold point reviews. Respondents should allow appropriate review periods within their proposed program, having regard to the overall project timeframe. Detailed review periods and approval pathways will be established with the successful Consultant as part of the integrated project program.
13
The Greater Hobart Cultural Venues Study, Cultural and Creative Strategy and City Heart Plan are publicly available and may be considered by respondents in preparing their response.
Council will provide the successful Consultant with relevant prior feasibility, concept and business case work in Council’s possession that may inform the commission. This material should be treated as background information rather than as establishing a predetermined precinct scope or preferred outcome.
14
Yes. Council will consider alternative payment schedules, including progress payments more frequent than the five milestones, where appropriate to the Consultant’s proposed methodology and programme. The final payment schedule will be agreed with the successful Consultant.
Updates made to this Request
Updates
None...